Yakima T.O.C. Load Assist

Presenters: Michael Dixon Ben Gheliuc Group Members: Haidar Al Gharash Daniel Gheliuc Fue Her Zach McCurter Capstone Advisors: Faryar Etesami Evan Thomas Yakima Sponsors: Mark Elliot Chris Sautter. Yakima T.O.C. Load Assist. overview. Introduction / Background

ollie
Download Presentation

Yakima T.O.C. Load Assist

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presenters: Michael Dixon BenGheliuc Group Members: Haidar Al Gharash Daniel Gheliuc Fue Her Zach McCurter Capstone Advisors: Faryar Etesami Evan Thomas Yakima Sponsors: Mark Elliot Chris Sautter Yakima T.O.C. Load Assist

  2. overview • Introduction / Background • Internal/External Customers • PDS Criteria • House of Quality • Technical Risk Management • Project Timeline • Summary

  3. Background • Current Yakima Designs.

  4. Competitors • Thule

  5. Malone

  6. Previous Attempts • Yakima’s first load assist design

  7. Target Persona • Average 45 year old 5’ 2” woman • Paddles a sea kayak • Rides a bike • Drives a Subaru Outback

  8. Internal Customers • Yakima PSU Capstone Team • Dr. Evan Thomas • Dr. FaryarEtasami • PSU Machine Shop

  9. External Customers • Chris Sautter • Mark Elliot • Yakima Legal Department • Yakima Financial Department • End-User • Target Persona

  10. PDS CRITERIA • Ergonomics • Ease of use for target persona • Max load assist • Cost • Target retail - $500 • Safety • Pinch points • Clear existing IP/Patents • Testing • Yakima internal standards – ISO #

  11. House of Quality

  12. Technical Risk managment • Load Assist mechanism fails • Clearence / height • Weight • Cost • Testing

  13. Project timeline

  14. Questions?