110 likes | 319 Views
The IDMS. DP1: Portfolio Management. Prov Infr Strat. DP1-1 Infrastructure Planning. DP1-2 Programme Management. Develop/review U-AMP (including prioritised MTEF works list). Develop/review C-AMP (incl portfolio level Work Plans). Develop /review Constr Proc Strat. Develop /review IPMP.
E N D
The IDMS DP1: Portfolio Management Prov Infr Strat DP1-1 Infrastructure Planning DP1-2 Programme Management Develop/review U-AMP (including prioritised MTEF works list) Develop/review C-AMP (incl portfolio level Work Plans) Develop /review Constr Proc Strat Develop /review IPMP Authorise Implementation Monitor & Control Close Out G1(a) G1(b) G2 U-AMP C-AMP Manage Implementation PC1 PF1.3 PF1.4 PF2.1 PF2.2 PF2.3 PF3 PF4 PF5 PF1.1 PF1.2 DP2: Project Management DP2-1 Implementation Planning DP2-2 Design DP2-3 Works DP2-4 Close Out Prepare Packages Define Packages Develop/Review IPIPs (Prgr & Proj level) Detailed design Compile MFC Info Handover works Adminstv Close Out Design devlpmt Construct / Deliver works Contracts Close Out G4 G5 G6(a) G6(b) G7 G8 G3 PEP1 PEP2 IPIP PEP3 PEP4 PEP5 PEP6 PEP7 PC2 PC3 PC4a PC5 PC4b T1 T2 PF1.3 PF1.4 PF2.1 PF2.2 PF2.3 PF3 PF4 PF5 DP3: Operations & Maintenance DP3-2 Mobilisation for Facilities Mgt DP3-3 Operations DP3-1 Recognise & accept assets DP3-4 Maintenance DP3-5 Demobilisation of Facilities Mgt PF1.3 PF1.4 PF2.1 PF2.2 PF2.3 PF3 PF4 G8 PF5