Land Consumption • 16,000 acres of land is developed each year in Massachusetts. • Current: 4.97 persons/acre • 1950: 11.19 persons/acre • More than twice as much land has been developed since 1950 than was developed in the previous 300 years.
Percentage Change in Land Use vs. Population 1950-1990 200% 180% 160% 140% 120% 100% % Increase 80% Increase in Population 60% 40% 20% Increase in Developed Land 0% 1950 1970 1990 Year Source: Massachusetts Executive Office of Environmental Affairs
Growth Pressures • Rapidly increasing sprawl development • Loss of open space and community character • Lack of economically viable housing • Social isolation • Threat to natural resources and water quality
Planning Boards Conservation Organizations Developers (Northeast Builders Assoc.) Regional Planning Agencies Federal Agencies North Shore Realtors Assn. State Agencies Green Neighborhoods Alliance
“I think the most important thing we accomplished in the first three years was getting beyond staring suspiciously at each other across the table and often treating each other with less than courtesy” PreservationProfit (town) (developer) “Boards are as much to blame as developers in causing costly delays in what too often results in an uninspired subdivision”
1. Align Roads 2. Draw the Lot Lines 3. Locate House Sites Open Space? Open Space Residential DesignFour Step Process 1. Identify Conservation Value Areas 2. Locate House Sites 3. Align Roads & Trails 4. Draw the Lot Lines
The process begins with determining how many lots could be developed under conventional zoning; this is the base yield of the property. From that point, the plan development process follows four basic steps:
1. Identify Conservation Value Areas on the site such as wetlands, significant trees or tracts of forest, habitat, cultural resources or buffer zones. Remove these from the “developable area”.
2. Place houses in the remaining area in a way that would maximize residents enjoyment of these areas by providing access to open space and preserving views.
3. Align roads and trails on the site to provide pedestrian and vehicle access.
Density Bonuses Reduced infrastructure Pork chop lots Creative use of frontage requirements Creative use of various lot sizes • Mixed housing types for low to moderate income • Yard Setbacks • Minimum Width at Building Line • Maximum Impervious Surface per Lot • Lot Shape Opportunities and Incentives
Density Bonuses • Towns may choose to give Density Bonuses: • Based on a % over the minimum of open space set aside • To encourage a specific age demographic • To promote town planning goals • To promote low to moderate income units • Based on the sensitivity of resources or the protection of resources • Reduction of bedrooms to minimize school impacts
Creative Partnership Pre-Application Mtg (Four Step Process) Special Permit Early in Process Conservation Values Streamlined Process Early Stakeholder Involvement Creative Incentives Alternative to Comp. Permit Regulatory Focus Early Financial Investment Concurrent Permit Processes Open Space Percentage Uncertain Timeframe Involvement at the hearing phase Density Bonus Only OSRD OR CLUSTER?
Less covering of impervious surfaces Permanent open space May contain mixed housing types Lots may be consumed by home, garage, pool, shed, patio, landscaping, etc. May or may not contain open space Usually reserved for upscale homes ORSD or Large Lots?
BENEFITS of OSRD Municipal - Reduces infrastructure and maintenance costs - Reduces demand to acquire new public parkland - Maintains local character Used in conjunction with affordable housing provisions, OSRD bylaws can expand housing opportunities in a community.
BENEFITS of OSRD Environmental - Protects unique or fragile habitats - Reduces the pollution impacts of stormwater runoff - Promotes aquifer recharge - Provides opportunities to link wildlife habitats - Conservation values are part of the planning process - Can further goals of open space and community development plans The planning process for OSRD inherently protects natural resources and promotes recharge to underlying aquifers.
BENEFITS of OSRD • Social and Recreational • - Reduces isolation and sprawl • - Enhances New England community character • - Promotes community involvement • Provides neighborhood connections with an interconnected • network of trails and open space • - Can be combined with 40B, the Local Initiative Program, to be • an alternative to comprehensive permit to achieve • affordable housing accreditation OSRD also preserves significant cultural and historic resources early in the planning process.
BENEFITS of OSRD For the Developer and Realtor - Streamlines plan review process; reduces time and costs - Adds valuable amenities that can enhance marketing and sale prices - Increases resale value; homes in OSRD subdivisions have shown to appreciate faster than those in conventional subdivisions - Provides flexibility to encourage developers to create “Green Neighborhoods” - Decreases site development costs by designing with the terrain The OSRD permitting structure encourages smart growth and facilitates a permitting process that is clear, easy to understand, and cost-effective to developers.
CASE STUDY Caldwell Farm Newbury, MA Caldwell Farm is a 66-unit housing project, 100 of the 125 acres being maintained as open space including fields, forest, freshwater, and saltwater wetlands.
Island Co-HousingWest Tisbury - 2000 • 49.4 acre site purchased by South Mountain Company • Subdivided into four parcels • 30 acres for 16 unit co-housing development • Pedestrian-oriented • Streets and vehicles on perimeter only • Community center, communal responsibilities • Comprehensive permit to cluster housing on 6 acres • 24 acres left as open space