1 / 22

ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD

ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD. UNIT 1 – ECO PARK CARSEVIEW ROAD FORFAR DD8 3BS OTHER BUSINESS ACTIVITIES CIVIL ENGINEER FOREST OWNER AND HARVESTING BUSINESS PROPERTY DEVELOPER BILL WATSON TEL: 01307 466699 FAX: 01307 462278 E-MAIL:- bill@ballindarg.co.uk.

omer
Download Presentation

ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ANGUS BIOFUELS&SCOTTISH WOODFUEL SUPPLIES LTD UNIT 1 – ECO PARK CARSEVIEW ROAD FORFAR DD8 3BS OTHER BUSINESS ACTIVITIES CIVIL ENGINEER FOREST OWNER AND HARVESTING BUSINESS PROPERTY DEVELOPER BILL WATSON TEL: 01307 466699 FAX: 01307 462278 E-MAIL:- bill@ballindarg.co.uk

  2. ANGUSBIOFUELS • WOODCHIP PRODUCER • BOILER INSTALLATION • HEAT SUPPLY CONTRACTS – ESCO • FLUE GAS FILTRATION SPECIALISTS

  3. BIOMASS PLANT • SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR • OPENED BY JOHN SWINNEY IN JAN 2008 • PROJECT COSTS: £3.0 MILLION

  4. MAIN CONSIDERATIONS OF SETTING UP PLANT • LOCATION TO TIMBER SUPPLY • LOCATION TO BOILERS • CAPITAL COST • GRANT ASSISTED BY SSBS AND SRDP • QUALITY OF CHIP • MOISTURE CONTENT OF CHIP • SIZE OF CHIP • HANDLING OF WOOD FROM FOREST TO BOILER

  5. WOODCHIP OUTPUT MAXIMUM OUTPUT = 100 TONNES OF DRY CHIP PER DAY I.E. 400,000 kWhrs OF HEAT/DAY TYPICAL HOUSE WILL USE APPROX 100 kWhrs/DAY (WINTER) TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs/DAY (WINTER)

  6. STORAGE OF WOOD & CHIPS • AIR DRYING = 5000 TONNES • AT ROADSIDE = 10,000 TONNES • DRY CHIP = 2000 TONNES

  7. WOOD CHIP DELIVERY SYSTEMS • Bulk Truck 150m3 per delivery • Tipping Trailer 40- 120m3 • Big Hook System 40-60m3 • Blower Trailer 20- 40m3 • Hi Lift Trailer 16m3 • Bulk Bags 2m3 per bag

  8. AIR QUALITY • PART 1V OF THE ENVIRONMENT ACT 1995 – LOCAL AIR QUALITY MANAGEMENT. • PARTICULATE MATTER SHOULD NOT EXCEED AN ANNUAL MEAN OF 18ug/m3 BY 31 DECEMBER 2010. • ENVIRONMENTAL HEALTH ARE RECOMMENDING ABATEMENT TECHNOLOGY. RHI REQUIREMENT

  9. Biomass Boiler Particulate Emissions Data with and without Filter

  10. ESCO • SUPPLY AND INSTALL BOILER (INCLUDING PLANNING & BUILDING WARRANT) Design and Build • MAINTAIN BOILER • CLEAN & DE-ASH BOILER • OFF-SITE MONITORING using BMS • ALL CIVIL, MECHANICAL AND ELECTRICAL WORK • CHARGE RATE PER kWhr THROUGH METER MONITORED ON FLOW AND RETURN PIPES ADVANTAGES FOR CLIENT • HAS LIMITED RISK • DOES NOT NEED TO MONITOR FUEL QUALITY • NOT RESPONSIBLE FOR FUEL EMISSION QUALITY • DOES NOT REQUIRE EXTRA PERSONNEL TO RUN BOILER

  11. RHI Renewable Heat Incentive • Consultation Deadline 26 April 2010 • Government Implementation April 2011 • Payments from 15 July 2009 • Proposed up to 45kw 9.0p/kw hr • Proposed 45kw to 500kw 6.5p/kw hr • Payments by OFGEM 15 years

  12. THANK YOU. • Bill Watson. • E mail : bill@ballindarg.co.uk • Mobile : 07976 820664 • Office :01307 466699

More Related