ANGUSBIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8TH SEPTEMBER 2011
ANGUSBIOFUELS • UNIT 1 – ECO PARK • CARSEVIEW ROAD • FORFAR DD8 3BS • FUEL SUPPLIERS • BILL WATSON • TEL: 01307 466699 • FAX: 01307 462278 • E-MAIL:- bill@ballindarg.co.uk
ANGUSBIOFUELS MAIN BUSINESS ACTIVITIES • FORESTRY OWNER • WOODCHIP PRODUCER • BOILER INSTALLATION • HEAT SUPPLY CONTRACTS
BIOMASS PLANT • SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR • OPENED BY JOHN SWINNEY • PROJECT COSTS: £1.2 MILLION
ISSUES IN SETTING UP PLANT • LOCATION TO TIMBER SUPPLY • LOCATION TO BOILERS • CAPITAL COST • GRANT ASSISTED BY SSBS • QUALITY OF CHIP • MOISTURE CONTENT OF CHIP • SIZE OF CHIP • HANDLING OF WOOD FROM FOREST TO BOILER
BIOMASSPRODUCTS • WOOD CHIPS – WET - ABOVE 30% M.C. • WOOD CHIPS – DRY – BELOW 25% M.C. • WOODCHIPS DRIED BY – NATURAL DRYING ARTIFICIAL DRYING
CHIPPERS • HEIZOHACK 400 SCREEN CHIPPER • JUNKKARI 500 DRUM CHIPPER • JENZ 561 CHIPPER
STORAGE OF TIMBER/CHIP • AIR DRYING = 5000 TONNES • AT ROADSIDE = 3000 TONNES • DRY CHIP = 2000 TONNES
WOODCHIP OUTPUT MAXIMUM OUTPUT = 100 TONNES OF DRY CHIP PER DAY I.E. 400,000 kWhrs OF HEAT TYPICAL HOUSE WILL USE APPROX 100 kWhrs TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs
DELIVERY OF WOODCHIP • ARTICULATED LORRY • HI-LIFT TRAILER • BULK TRAILER • BLOWER TRAILER • BULK BAGS
BOILER INSTALLATIONS CHOICE BETWEEN – WOODCHIP OR WOOD PELLET DRY WOODCHIP – LESS THAN 25% MC • GENERALLY LARGER INSTALLATIONS • LARGER FUEL STORAGE FACILITIES • LOWER FUEL COSTS THAN PELLETS AT PRESENT. AROUND 3.5p/kWhr • LONG SHELF LIFE
WET WOODCHIP- ABOVE 30% M.C. • VERY LARGE BOILERS & POWER STATIONS • MORE DELIVERIES PER ANNUM • MORE CONTAMINATION • SHORT SHELF LIFE DUE TO COMPOSTING & MOULDING • PRICE SIMILAR TO DRY WOODCHIP
WOOD PELLETS • IDEAL FOR SMALLER BOILER INSTALLATIONS • LESS BULKY • MORE EXPENSIVE – AROUND 4.5p/kWhr • CAN BREAK DOWN IF GET DAMP OR WET • LIMITED SHELF LIFE
BOILERS INSTALLED – 10KW TO 600KW • BINDER • FROELING • VETO • CALIMAX • JANFIRE • SONNYS • GILLIES – Under consideration
CHOOSING A BOILER • WHAT SIZE DO I NEED AND WHEN DO I NEED HEAT? • HOW SOPHISTICATED DO I NEED? • FUEL STORAGE AND DELIVERY? • BACK-UP SERVICE? • GO AND LOOK AT INSTALLED EXAMPLES • ASK QUESTIONS • DOES IT COMPLY WITH THE LOCAL ENVIRONMENTAL CRITERIA?
HEAT SUPPLY CONTRACTS FACTORS TO CONSIDER • COST OF BOILER AND INFRASTRUCTURE • PRICE FOR FUEL • COST OF DELIVERY • COST OF MAINTENANCE • COST OF CLEANING/DE-ASHING • SINKING FUND • PROFIT
THANK YOU. • DO YOU HAVE ANY QUESTIONS?