CMS CMS MAINTENANCE, RADIATION SHIELDING & TOOLING (Preliminary, for discussion only) A.Surkov

CMS CMS MAINTENANCE, RADIATION SHIELDING & TOOLING (Preliminary, for discussion only) A.Surkov University of Wisconsin. CERN April 17. 2012. CMS maintenance (scenario N1-6). CMS maintenance (scenario N7-13). CMS opening possibilities (10m-10.5m).

orea
Download Presentation

CMS CMS MAINTENANCE, RADIATION SHIELDING & TOOLING (Preliminary, for discussion only) A.Surkov

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS CMS MAINTENANCE, RADIATION SHIELDING & TOOLING (Preliminary, for discussion only) A.Surkov University of Wisconsin CERN April 17. 2012

  2. CMS maintenance (scenario N1-6)

  3. CMS maintenance (scenario N7-13)

  4. CMS opening possibilities (10m-10.5m)

  5. Safety gap between BP & SE support cone

  6. Radiation shielding. Main support. Traverse

  7. Radiation shielding & main support 3D-D.Druzhkin

  8. Radiation shielding & main support 3D-D.Druzhkin

  9. Radiation shielding & main support lifting 3D-D.Druzhkin

  10. Traverse 3D-D.Druzhkin

  11. Radiation shielding & main support lifting (PIXEL reinstallation) Front shielding for PIXEL maintenance only?! R less than 1550mm 3D-D.Druzhkin & Boki

  12. Main support/Traverse Interface TRAVERSE Main support

  13. Main support/Traverse Interface

  14. PIXEL maintenance (10)

  15. PIXEL maintenance

  16. PIXEL table/PP1 interface

  17. Main platforms adjustable support (10)

  18. Main platforms support (10)

  19. BP reinstallation (12)

  20. BP reinstallation (12)

  21. Dear Colleagues,This material was prepared for discussion. Your recommendation, remarks and comments are welcome.Without your participation will be impossible to providethe radioactive shielding & tooling design.I hope to have response from following people !: Wolfram Zeuner‎; Patrick Lepeule‎; Joseph Howell‎; Dick Loveless‎; Ken Bell‎; Lino Demaria‎; Karl Aaron Gill‎; Gino Bolla‎; Jean Bos‎; Nicola Bacchetta‎; Dmitry Druzhkin‎; Austin Ball‎; Nicolas Siegrist‎; Gerard Faber‎; Farshid Feyzi‎; Stephane Bally‎; Wolfgang Funk‎; Domenico Dattola‎; Daniel Wenman‎; Ettore Focardi‎; Nebojsa Smiljkovic‎; Hubert Gerwig; Christoph Schaefer; Andrea Gaddi; Michel Arnaud Also it is necessary the responses from the sub-detectors and subsystems coordinators.