CERN Cryomodule Requirements for Crab C avities

CERN Cryomodule Requirements for Crab C avities. O. Capatina (CERN). Functional specification. https ://espace.cern.ch/HiLumi/WP4/Lists/Team%20Discussion/AllItems.aspx. General. SPS tests LHC final configuration. General. LHC environment. Q4. D2. IP. D2. Q4. General.

orly
Download Presentation

CERN Cryomodule Requirements for Crab C avities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CERN Cryomodule Requirements for Crab Cavities O. Capatina (CERN) LHC Crab Cryomodule meeting

  2. Functional specification https://espace.cern.ch/HiLumi/WP4/Lists/Team%20Discussion/AllItems.aspx LHC Crab Cryomodule meeting

  3. General • SPS tests • LHC final configuration LHC Crab Cryomodule meeting

  4. General • LHC environment LHC Crab Cryomodule meeting

  5. Q4 D2 IP D2 Q4 General • LHC environment • ~ 10m LHC Crab Cryomodule meeting

  6. General • LHC environment LHC Crab Cryomodule meeting

  7. General • SPS environment LHC Crab Cryomodule meeting

  8. General • SPS environment LHC Crab Cryomodule meeting

  9. General • SPS : • 2 (identical) cavities in a cryomodule • 3 different cryomodules LHC Crab Cryomodule meeting

  10. General • SPS : • 2 (identical) cavities in a cryomodule • 3 different cryomodules LHC Crab Cryomodule meeting

  11. General • SPS : • 2 (identical) cavities in a cryomodule • 3 different cryomodules LHC Crab Cryomodule meeting

  12. Geometrical constraints • SPS : LHC Crab Cryomodule meeting

  13. Geometrical constraints • SPS : LHC Crab Cryomodule meeting

  14. Geometrical constraints • SPS : LHC Crab Cryomodule meeting

  15. Geometrical constraints • SPS dummy beam pipe : SPS configuration LHC configuration LHC Crab Cryomodule meeting

  16. Geometrical constraints • SPS - dummy beam pipe : • Dummy LHC beam pipe at 194mm horizontally from the SPS beam pipe • Dummy beam pipe can be on either side of the cavity but preference opposite to Y chamber LHC Crab Cryomodule meeting

  17. Geometrical constraints • SPS - dummy beam pipe : • Dummy LHC beam pipe at 194mm horizontally from the SPS beam pipe • Dummy beam pipe can be on either side of the cavity but preference opposite to Y chamber LHC Crab Cryomodule meeting

  18. Geometrical constraints • SPS - dummy beam pipe : • Dummy LHC beam pipe at 194mm horizontally from the SPS beam pipe • Dummy beam pipe can be on either side of the cavity but preference opposite to Y chamber LHC Crab Cryomodule meeting

  19. Geometrical constraints • SPS – Y chamber apperture: • With new Y chamber (510 mm aperture), SPS cryomodule transverse dimensions coherent to LHC => could allow similar SPS/LHC basic solutions for tuner, coupler position • SPS cryomodule design should not be over-constrained • Baseline: replacing the existing SPS Y chamber LHC Crab Cryomodule meeting

  20. Geometrical constraints • SPS interfaces: • Connexions to main coupler • From top, vertically LHC Crab Cryomodule meeting

  21. Geometrical constraints • SPS interfaces: • Connexions to main coupler • Limit risk of loads transmitted directly to the cavity from connection to RF module – Double walled tube could be used as part of the supporting system of the cavity LHC Crab Cryomodule meeting

  22. Geometrical constraints • SPS interfaces: • Connection to cryo • From top, vertically for main circuits • N2 warm return may be sidewise cryostat interface thermal screen at ~80 K common pumping collector helium tank CWT crab cavity CWT Power coupler intercept LHC Crab Cryomodule meeting

  23. Alignment • LHC - Alignment requirements (position accuracy and position stability) – based on general beam dynamics considerations: • Transverse rotation per cavity should be less than 5 mrad • Transverse misalignment per cavity (in both planes) should be less than 0.7 mm • Cavity tilt with respect to the longitudinal axis should be less than 1 mrad • Cavity longitudinal misalignment should be less than 10 mm • Active alignment will be studied in a dedicated set-up LHC Crab Cryomodule meeting

  24. Alignment • SPS • Alignment required for operation less than LHC • To limit SPS crymodule complexity (win time and limit risk) • No active alignment needed for SPS tests • Foresee a system for monitoring the cavity positions instead LHC Crab Cryomodule meeting

  25. Process & instrumentation • Operated at 2 K saturated helium bath -> ~30 mbar • Two circuits: 2 K and 80 K • Main interface from the top with 4 main lines (LHe IN, GHe pumping, 80 K IN and 80 K OUT): • internal pipes welded, external envelope bolted cryostat interface thermal screen at ~80 K common pumping collector helium tank CWT crab cavity CWT Power coupler intercept See Krzysztof’s talk LHC Crab Cryomodule meeting

  26. Process & instrumentation • 80 K screening will be provided with He or LN2 • Power couplers and Cold/Warm Transitions intercepts at 80 K, then outgoing gas directed to recovery line cryostat interface thermal screen at ~80 K common pumping collector helium tank CWT crab cavity CWT Power coupler intercept LHC Crab Cryomodule meeting

  27. Process & instrumentation • In general: maximize instrumentation for the prototypes • Minimum instrumentation requirements: • Gauge for helium level measurement from the bottom through the phase separator to be installed for each helium tank (LT x 2) • Pressure measurement on the saturated helium bath (PT x 1) • Temperature measurement on the bottom each helium tank (suggested CERNOX type transducer, TT x 2) • Electrical heaters of 50 W on each helium tank (EH x 2) cryostat interface thermal screen at ~80 K common pumping collector helium tank CWT crab cavity SKETCH CWT Power coupler intercept EH EH PT TT TT LT LT LHC Crab Cryomodule meeting

  28. Process & instrumentation • Temperature measurement on 80 K screen line (TT x 2 on inlet and outlet) • Instrumentation for 80 K intercept circuits – definition underway • JT valve and sub-cooling HX are foreseen to be installed out of the cryostat • All sub atmospheric instrumentation/safety devices with ambient air interface will have to be equipped with appropriated helium guard. cryostat interface thermal screen at ~80 K common pumping collector helium tank CWT crab cavity SKETCH CWT Power coupler intercept EH EH PT TT TT LT LT LHC Crab Cryomodule meeting

  29. Piping sizing • Pumping collector sizing (recommended 100mm dia) • Gas speed lower than 5 m/s • Min 50 mm for level regulation, additional buffer for ~ 20 min of operation • Compatibility with safety devices for pressure limit requirements to be confirmed Liquid level 100 mm ~90 mm maxi: 5 m/s 92 Regulation ~50 mm 0 mm * Calculation done assuming: collector diameter of 100 mm, He mass flow = 2 g/s, GHe temp = 2 K, GHe press = 20 mbar. LHC Crab Cryomodule meeting

  30. Helium tank sizing • Helium tank to be dimensioned correctly to extract maximum heat load • Heat flux in He II depend on bath temp. and channel dimension LHC Crab Cryomodule meeting

  31. Helium tank sizing • Helium tank to be dimensioned correctly to extract maximum heat load • If helium cross section expected to extract (order of magnitude) 1 W/cm2 => detailed calculations needed • Minimize reasonably the liquid helium volume (max. 40 L/cavity if possible) LHC Crab Cryomodule meeting

  32. Heat load budget LHC Crab Cryomodule meeting

  33. Safety equipment • Given its designated function, we are in the presence of ‘high safety relevance’ equipment, i.e., special equipment according to CERN’s SR-M; • The HSE Unit Safety Commission shall give clearance from design’s release to commissioning; • A Safety File with all relevant technical documentation to be approved by the Safety Commission shall be prepared from day 1 (EDMS); See talk of Luis LHC Crab Cryomodule meeting

  34. Safety equipment • Two design strategies are possible: to EN Standards or to ASME Section VIII + specific technical requirements; • Combined design (EN+ASME) can be accepted if justified; • Design shall target the hydrostatic test pressure of 2.6 bar (abs, helium vessel); • Equivalent to EN conventional material grades are preferred; • ‘Non-conventional’ material properties are to be demonstrated by testing. LHC Crab Cryomodule meeting

  35. Materials • Helium tank material not imposed; however titanium involves • More complex interfaces • Not covered by the Harmonised European Standards • Stainless steel flanges (1.4429, AISI 316LN) for beam pipe interface • Equivalent to EN conventional material grades are preferred LHC Crab Cryomodule meeting

  36. Magnetic shielding • Static magnetic field shielding required • The field to be below 1 µT at the outer surface of the cavity • Numerical simulations to determine the material thickness and specification, as well as geometry LHC Crab Cryomodule meeting

  37. Cryostating • Integration into cryostat at CERN - most likely location SM18 LHC Crab Cryomodule meeting

  38. Concluding remark • SPS cryomodule: • Expected 3 different conceptual designs by the end of the year • Collaboration with regular working sessions to merge CERN requirements and LARP/UK effort • CERN is ready to help with several competencies LHC Crab Cryomodule meeting