An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fern Valley Interchange Fern Valley Interchange Project Development Team Meeting February 3, 2011 9:00 – 11:00 p.m.

  2. Fern Valley Interchange Agenda Introductions, Review Agenda, Approve Minutes Nancy Reynolds IAMP Update Mike Baker Public Hearing Summary Nancy Reynolds CAC Recommended Alternative to Advance Nancy Reynolds Public Comment (Audience) Nancy Reynolds EA Public Comment Overview Nancy Reynolds PDT Recommendation of Alternative to Advance Nancy Reynolds Next Steps Nancy Reynolds Comfort Check Pat Foley Thank You for Participating Dick Leever Adjourn

  3. Fern Valley Interchange IAMP Update Status of Interchange Area Management Plan

  4. Public Hearing SummaryBackground Fern Valley Interchange • About 30 alternatives evaluated in developing proposed project. • Two alternatives evaluated in the Environmental Assessment (EA): • No-Build Alternative • Build Alternative • EA published in October 2010. • Public hearing/open house held in November 2010. Purpose: • Inform public of project status, contents of the EA, and next steps. • Receive public comments on the EA prior to a recommendation on the preferred alternative.

  5. Public Hearing Summary (cont.)Attendance & Comments Fern Valley Interchange • About 80 people attended the public hearing. • 6 oral testimonies were received. • 20written comments were received.

  6. Public Hearing Summary (cont.)Comment Preference Fern Valley Interchange • 10 supported the Build Alternative • 4 supported the No-Build or a different alternative

  7. Public Hearing Summary (cont.)Build Alternative Support Fern Valley Interchange • EA looks great. • ODOT executed comprehensive NEPA process with extensive public outreach and testimony. • Bicyclists, pedestrians, autos & trucks will benefit. • Project would be very beneficial to Phoenix & other communities. • Phoenix East Side Traffic Study group supports project.

  8. Public Hearing Summary (cont.)Build Alternative Suggestions Fern Valley Interchange • At Fern Valley Rd/S. Phoenix Rd. intersection, provide signal, right-turn lane, or 2- or 3-way stop signs. • At Extended S. Phoenix Rd, provide 2 left-turn lanes for traffic turning south towards interchange. • Minimize the cost of water line relocation for the City of Phoenix. • Provide access to pedestrians & bicyclists during construction.

  9. Public Hearing Summary (cont.)Other Key Issues Raised Fern Valley Interchange • Need interchange or overcrossing at South Stage Road. • Too many impacts to businesses during tough economic times. • Realign Fern Valley Road to connect to OR 99 at Cheryl Lane rather than Ray’s Market due to pedestrian safety and traffic flow concerns. • Need easier accessibility to the truck stop. • EIS is required for this project due to potential substantive damage to water quality, farmland and air quality.

  10. Public Hearing Summary (cont.)Other Key Issues Raised (cont.) Fern Valley Interchange • EA should include more build alternatives. • EA should include additional cumulative impact analysis due to urbanization. • Negative impact of parking removal on individual property. • Important to repair Bear Creek Bridge and I-5 structure. • Remove the previous [interim] project on Fern Valley Road. • Air quality impacts associated with truck traffic traveling additional distance. • Should not solve regional traffic problems at the Fern Valley Interchange—only local problems.

  11. CAC Recommended Alternative to Advance Fern Valley Interchange • Summary of CAC Recommendation for the Fern Valley Interchange project.

  12. Audience Public Comments Fern Valley Interchange • Opportunity for public comments from members of the audience.

  13. PDT Comment Overview Fern Valley Interchange • PDT discussion of public comments.

  14. PDT Recommendation of Alternative to Advance Fern Valley Interchange Identify preferred alternative to advance by written ballot: • Build • No-Build

  15. Next Steps Fern Valley Interchange Following PDT recommendation on Build vs. No-Build Alternative: • FHWA decision on Build vs. No-Build Alternative • Publication of decision document