110 likes | 263 Views
PROJECT Operation and Maintenance of the Convention Center of Lima (Centro de Convenciones de Lima) February 2016. Lima Centro de Convenciones (LCC). Location : Centro Cultural de la Nación, Av. Arqueología esq. Av. Del Comercio - District of San Borja. Area : 85,441.39 m2.
E N D
PROJECT • Operation and Maintenance of theConvention Center of Lima (Centro de Convenciones de Lima) • February 2016
Lima Centro de Convenciones (LCC) • Location : Centro Cultural de la Nación, Av. Arqueología esq. Av. Del Comercio - District of San Borja. • Area: 85,441.39 m2. • Capacity: 9,950 persons • Status: Currently in construction by the company Constructora OAS S.A. Branch of Peru. • Total investment : S/. 534,841,943.23 ( SNIP Code N° 269264) includes the technical file, infrastructure, technology, furniture, equipment and supervision. • Culmination: was concluded before the Annual Meeting of Governors of the World Bank and the International Monetary Fund (October 2015), held in the city of Lima.
Description of Infrastructure CONFERENCE ROOMS: • Level 1: 2 rooms of 1,800 m2 e/o – 1200 persons. • Level 4: 2 rooms of 750 m2, 1 room of 225 m2, 1 room of 150 m2, 2 rooms of 300 m2 , 2 rooms of 450 m2. • Level 5: 1 room of 150 m2 , 1 room of 225 m2. • Level 6: 2 rooms of 750 m2, 1 room of 150 m2, 1 room of 225 m2, 1 room of 450 m2. • Level 8: Plenary room 5,250 m2. Total area : 14,925 m2 Total quantity of persons : 9,950
Description of Infrastructure LOWER LEVELS : • Basements 1, 2, 3 and 4: 4 underground levels of parkings for 945 units. • Truck parking : loading and discharge dock. OUTSIDE • Private bus stop (in square of Culture).
Description of Infrastructure OTHER SPACES: • Translation booths (Level 2, 5, 6, 7 and 9) • Waiting rooms (Level 1, 2, 4, 6, 8 and 9) • Administrative area (Level 3 and 7) • Coffee shop (Level 3) • Platforms green area (Level 5, 6, 8 and 10) • Recreation (Level 5) • Restaurant (Level 5) • Cuisine (Level 5 and 7) • Warehouse (in all levels)
Lima Centro de Convenciones (LCC) • High technology. • Converged system of communications. • Wifi for 10,000 simultaneous connections. • Support connectivity for audio visual. • Possibility of simultaneous events.
Location of the Project CULTURAL CENTER OF THE NATION LCC
Main Characteristics of the Process Public Investment : Executed Design Construction Financing Lima Convention Center (Centro de Convenciones de Lima) (LCC) El Proyecto Operation Maintenance Private Investment : To be implemented Referential Video : https://www.youtube.com/watch?v=YaJ20-ascsk