Winter Operations

Winter Operations. MSP International Airport. 3400 acres 1200 aircraft operations/day 135 non-stop destinations 50” average annual snowfall. MSP International Airport. Small department of 15 employees Technology used as leverage for Collaborative Decision Making (CDM) process

otylia
Download Presentation

Winter Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Winter Operations MSP International Airport

  2. 3400 acres 1200 aircraft operations/day 135 non-stop destinations 50” average annual snowfall MSP International Airport

  3. Small department of 15 employees Technology used as leverage for Collaborative Decision Making (CDM) process Interpersonal relationships as/more important MAC Airside Operations

  4. Winter Operations MSP International Airport Pre-Storm Storm Post-Storm

  5. Pre-Storm

  6. NWS Watch/Warnings Airport Weather Warning NWSChat Pre-StormWeather Forecasts

  7. NOAA Graphical Forecasts Pre-StormWeather Forecasts

  8. NOAA Tactical Decision Aid Pre-StormWeather Forecasts

  9. Private Weather Contractors • Telvent DTN • Weather Watch Pre-StormWeather Forecasts

  10. Private Weather Contractors • Telvent DTN • Weather Watch • Delta Air Lines Meteorology Pre-StormWeather Forecasts

  11. Delta Air Lines FAA Air Traffic • Tower • TRACON • ZMP • Command Center Pre-StormTelecons

  12. Staffing Levels Pre-StormMAC Internal Planning

  13. Staffing Levels Staffing Start Time Pre-StormMAC Internal Planning

  14. Vaisala Navigator Pre-StormSurface Temperatures

  15. Storm

  16. VasailaAvicast StormRadar

  17. Stanwyck Avionics StormASOS

  18. FlightExplorer StormFlight Tracking

  19. SensisAerobahn StormFlight Tracking

  20. SensisAerobahn StormFlight Tracking

  21. AmeriTrak StormVehicle Tracking

  22. AmeriTrak StormVehicle Tracking

  23. Surface Friction Testing • “Pre-Run” StormRunway Closures

  24. Surface Friction Testing StormRunway Closures

  25. Surface Friction Testing StormRunway Closures

  26. Delta Air Lines FAA Air Traffic • Tower • TRACON • ZMP • Command Center StormTelecons

  27. PASSUR Opsnet StormAirport Status/Future Plans

  28. Plows Brooms Blowers Sanders Deicers StormRunway Closures

  29. Surface Friction Testing • “Post Run” StormRunway Closures

  30. Post-Storm

  31. Lighting and signage inspection Snowbank profiles Post-StormClean-up

  32. Lighting and signage inspection Snowbank profiles Post-StormClean-up

  33. Snow-melters Post-StormClean-up

  34. Other marketing efforts Post-StormClean-up

  35. What went right? What can “we” do better next time? Post-Storm”Snow Critique”

  36. Eliminate “Information Overload” “Just-in-Time” information Going forward?

  37. Dude, where’s my car? Josh PaurusDuty Manager – Airside OperationsMSP International Airportjoshua.paurus@mspmac.org