1 / 6

200 miles of light rail and BRT by 2030

200 miles of light rail and BRT by 2030. Connect the activity of cores throughout the region with transit and have vast majority of new housing and office developments within these activity centers. Why promote LRT and BRT?. Reduces reliance on private automobiles

owen-ramsey
Download Presentation

200 miles of light rail and BRT by 2030

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 200 miles of light rail and BRT by 2030 • Connect the activity of cores throughout the region with transit and have vast majority of new housing and office developments within these activity centers

  2. Why promote LRT and BRT? • Reduces reliance on private automobiles • Provides viable alternative to driving alone • Transit stations are focal points for compact, mixed-use, walkable, transit-oriented development, which make them more sustainable • Reduces vehicle-miles of travel and emissions

  3. Post, Present and Future Miles of Transitway in Metropolitan Washington, D.C. 861 Miles of Transitway 433 226

  4. Post, Present and Future Population in Metropolitan Washington, D.C. Population (in millions)

  5. Miles of Transitway Per 100,000 Population in Metropolitan Washington, D.C. Miles of Transitway Per 100,000 Population

  6. So what can we conclude from these numbers? • Washington was better served by transit 80 years ago than it is today. • Plans have been proposed to double the existing transitway mileage. • Even with this additional mileage, the region would be served by less than half the mileage provided 80 years ago when indexed to population. • 200 additional miles of transitway is a little less than half the planned mileage and is a reasonable goal.

More Related