1 / 5

VOCALS-UK ARSF Status

VOCALS-UK ARSF Status. Grant Allen (grant.allen@manchester.ac.uk). VOCALS Planning Meeting, Manchester, 29 th July 2008. ARSF – Important Dates. 11 Aug – 18 Aug – Pylons onboard for PCASP test etc 19 August – Pylons shipped to Arica 29 Sep – 3 Oct – Instrument Fit, Kiddlington

owen
Download Presentation

VOCALS-UK ARSF Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VOCALS-UK ARSF Status Grant Allen (grant.allen@manchester.ac.uk) VOCALS Planning Meeting, Manchester, 29th July 2008

  2. ARSF – Important Dates 11 Aug – 18 Aug – Pylons onboard for PCASP test etc 19 August – Pylons shipped to Arica 29 Sep – 3 Oct – Instrument Fit, Kiddlington 6 – 10 Oct – ARSF leave / Contingency 10 Oct – Lidar Fit 16 – 24 Oct – Transit to Arica 26 Oct – 14 Nov – Science flying 16 Nov – 26 Nov – Transit to Kidlington and de-fit

  3. Instruments/Status • Eagle/Hawk – Hyperspectral imagers (Vis-NIR) – Approved, ARSF-operated • Aerosol Lidar – Leosphere. Approved, Hugo Ricketts • AIMMS-20 – Thermodynamics and turbulence, OK • Grimm 1.09 – OPC 3-25 um - OK • PCASP-100 – Approved. Shipped end of July, Need to get to ARSF quickly for test before pylons are shipped. • Aerosol Lidar, shipped by Leosphere. Fitted 10-13th Oct • FSSP-100 – Coarse mode aerosol/cloud • Polarimeter – Thomas Ruhtz

  4. Personnel / Crew Rotation • 4 Seats – Mission Scientist, Eagle/Hawk operator, Lidar Operator, Polarimeter operator • 3 pilots, 2 ARSF technical staff (Phil Goy + Gary Llewelyn) • No double-crewing of aircrew! 7/8th Nov hard down days due to switchover

  5. Data Flow • Eagle/Hawk – QA assessed in field, Calibrated images processed by PML (1 month turnaround). • Lidar – QA assessed in field. Possible quick-looks/images. • Thermodynamic and aerosol instruments – Assessed in field, quick-looks available. • All data backed up to a central hard-drive/server

More Related