Modeling Various Tolling Schemes Using Emme : Seattle Experience

Modeling Various Tolling Schemes Using Emme : Seattle Experience. Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget Sound Regional Council Youssef Dehghani, Parsons Brinckerhoff.

ozzie
Download Presentation

Modeling Various Tolling Schemes Using Emme : Seattle Experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modeling Various Tolling Schemes Using Emme:Seattle Experience Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget Sound Regional Council Youssef Dehghani, Parsons Brinckerhoff Model City 201122nd International Emme Users' ConferenceSeptember 16, 2011 | Portland, Oregon

  2. Purpose • Toll modeling methods/approaches • Seattle Experience • Four toll feasibility studies • Reflections & thoughts Presentation Outline

  3. Tolling as a tool to finance highways and manage congestion Toll feasibility studies in the Seattle Region Challenges faced in modeling highway tolls Future modeling needs Presentation Purpose

  4. Ad-hoc non-network-based methods • 4-Step modeling process • Primary reliance on route choice effect using generalized costs assignment process • Reliance on toll choice models capable of simulating toll cost effect discretely thru trip distribution, mode choice and assignment steps • Activity-based models (ABM) • Role of mesoscopic & mirco-simulation models Toll Modeling Methods/Approaches

  5. Survey data • Revealed/Stated Preference (VOT) • Counts data • Speed measurements • Network update/refinement • Model estimation & validation Data Requirements

  6. Assess toll study level & focus • Sketch level, Toll feasibility or Investment Grade • Congestion management vs. revenue maximization • Tolling schemes (e.g., dynamic pricing, single-point, segment, etc.) • Tolling general purpose lanes or HOV lanes • Budget & schedule • Determine appropriate method/approach Model/Approach Selection

  7. All toll studies at feasibility/preliminary assessment level Current PSRC 4-step model deemed adequate Performed network refinement & validation analysis relevant to the study/project corridor Seattle Experience

  8. Single point tolling • Segmental tolling • Ramp to ramp toll rates (OD level) • Toll rates within a defined highway segment and between segments • Distance-based tolling and class-specific tolling Tolling Schemes Studied

  9. Example Toll Feasibility Studies • SR 99 Alaskan Way Viaduct Replacement Finance Plan • SR 520 Toll Traffic and Revenue Technical Report – 2008 • Sketch Level Feasibility Study – East Corridor Tolling Study (I-405/SR 167) • I-5 Express Lane System Pre-Design Study

  10. SR 99 Alaskan Way Viaduct FP • A two-mile-long tunnel replacing the existing viaduct • Surface street improvements • Tolls as a funding mechanism • Segmental tolling concept was evaluated

  11. SR 99 Toll Scheme Montlake West Seattle Bridge Alaskan Way Harrison St Valley St Dexter Way 100% Toll 20% Toll Lower Toll Lower Toll Lower tolls are applied only for vehicles not using the tunnel, but using the sections shown above. N Tolling scheme shown was analyzed but is not planned for implementation.

  12. Southbound Alaskan Way Republic St Valley St Aurora Ave Roy St Royal Brougham Way Dexter Ave N Seattle Freeway/ Spokane St Northbound Segmental Tolling Tunnel Tolling SR 99 Toll Coding N

  13. SR 99 Toll Diversion Montlake -34%-26% peak 20% Toll +17%+13% peak +5%+3% peak N

  14. SR 99 Highlights Challenges Approaches/Resolutions • Capturing toll diversion on the local streets • Level of Service issues on the local streets • Diverting trips are captured by tolling ramps • Dense network – difficult to capture true diversion • Need for a mesoscopic and microscopic level of analysis

  15. SR 520 Tolling & Revenue Report • Replacement of the aging floating bridge • Other corridor and interchange improvements • Tolls as a funding mechanism • Segmental tolling concept was evaluated

  16. SR 520 Toll Scheme Montlake Blvd Bellevue Way 100% Toll 108th Ave 92nd Ave 84th Ave Arboretum 20% Toll 10% Toll 20% Toll Tolling scheme shown was analyzed but is not planned for implementation.

  17. A B C D E F G H T T T T A - - - - 1 2 2 2 T T T T B - - - - 1 2 2 2 T T T C - - - - - 2 2 2 T T T D - - - - - 2 2 2 T T E - - - - - - 3 4 T T T T F - - - - 2 2 2 3 T T T T T G - - - 2 2 2 3 6 T T T T T H - - - 2 2 2 4 6 SR 520 Toll Coding T3 T1 T6 Lk Washington Bridge T4 T4 T1 T2 T6 T3 H A B C D E G F Dummy links for tolling T1 – 20% Toll T2 – 100% Toll T3 – 10% Toll T4 – 20% Toll T6 – 20% Toll

  18. SR 520 – Extended Tolling Scheme Montlake Blvd Bellevue Way 30% Toll 100% Toll 108th Ave Arboretum 92nd Ave 84th Ave 30% Toll 40% Toll 20% Toll 40% Toll 10% Toll 20% Toll

  19. SR 520 Highlights Challenges Approach/Resolutions • Imposing ramp-to-ramp, OD level tolls using currently available tools in Emme • OD level tolls modeled using dummy links • Dummy links concept worked because: • Fewer number of interchanges • Relatively simple tolling scheme • Nearly impossible for more involved schemes or longer corridors

  20. Sketch level feasibility:I-405/SR167 • Variety of corridor improvement, including widening • Tolls as a funding mechanism • Tolling GP lanes as an alternative to HOT lanes • Tolling I-405 and SR 167 at a simple segmental rate • Quick study

  21. I-405 Toll Scheme Montlake 20% Toll SR 167 I-5 (South) to Bellevue I-5 (North to Bellevue) N Tolling scheme shown was analyzed but is not planned for implementation.

  22. I-405/SR 167 Highlights Challenges Approaches/Resolutions • Perform the study within 3 weeks to support policy discussion • Segregating the freeway movements to capture all toll movements on links • Keep HOV trips toll-free and using the HOV links • Minimize model changes: • Network • VOT • Model Procedures • Captured all the required tolling movements • The coding scheme does not identify highway ramp movements by direction • Assignment properly handled HOV trip assignment

  23. I-405/SR 167 Toll Coding Arterial through movement not separated from the ramp volumes Highway ramp movement separated – by entry/exit. Not by direction. I-5 GP I-5 HOV Arterial Arterial-HOV movement prohibited through turning restrictions

  24. I-5 Express Lane System: Pre-Design Study • 91-mile corridor • Variety of highway improvements • Tolls as a funding mechanism while creating travel options • Three Toll Facilities • HOV to HOT conversion • New HOT lanes • Tolling of existing Reversible Lanes

  25. I-5 Toll Scheme Montlake 20% Toll 1 2 3 4 5 6 Reversible 8 9 10 11 N Tolling scheme shown was analyzed, but will not necessarily be selected for implemenation.

  26. I-5 Highlights Challenges Approaches/Resolutions • Coding segment tolls with a new network coding convention • Study area length, 91miles, along with the links involved • Existing VOTs do not necessarily consider variability in VOT by trip • Limited time and budget for model updates • The coding convention allows for identification of highway ramp movements by direction directly on the links • Captured all the required tolling movements, including open tolling • Existing PSRC VOT used • Extensive QC of turning movements and tolled links

  27. I-5 Express Toll Lanes Coding Arterial through movement not separated from the ramp volumes or GP-HOV connector I-5 GP I-5 HOV Arterial Arterial-HOV movement prohibited through turning restrictions

  28. I-5 Express Toll Lanes Coding GP-HOV movements separated from interchange. GP-HOV movements segregated by directional movements. I-5 GP I-5 HOT Arterial GP-HOT movement controlled through turning restrictions

  29. Assess Study Level & Focus • Sketch Level • Investment Grade • Does it require micro-simulation? • Available Modeling Procedures • Data Collection • Model Estimation/Validation • Available Resources and Schedule Reflections & Thoughts

  30. Focus on the study area • Network refinements • Validation checks Reflections & Thoughts

  31. Procedural Limitations in the Software • Ramp-to-ramp, OD level tolls • A distribution of VOT Reflections & Thoughts

  32. Questions?