ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning SummitJuly 29, 2008Astor Crown PlazaNew Orleans, Louisiana
Map Legend Code for Base Plan and Construction Plan Projects Indicated on Maps BP08-036 = Project Number from 2008 Base Plan CP(2011) = 2008 Construction Plan and Expected In-Service Year DCP(2011) = 2009 Draft Construction Plan and In-Service Year BP08-036 CP(2011) DCP(2011) Project is in 2017 model Project is not included in model Background Color Indicates Projects’ Inclusion In Case
NA NA DCP(2013)
NA NA DCP(2013)
Other Areas These concerns seen in real-time may be relieved by projects in the Base Plan, Construction Plan or Draft Construction Plan. • Hot Springs-Bismark 115kV FTLO El Dorado-Longwood 345kV (Base Plan Project) • Liberty-Gillsberg 115kV FTLO Franklin-Bogalusa 500kV (Construction Plan Project with ISD 2009) • Hartburg-Inland Orange 230kV FLTO Hartburg-Cypress 500kV (Draft Construction Plan Project with ISD 2010)
Base Plan Development Next Steps • Stakeholder Comments • Discuss Stakeholder Comments at September LTTIWG • Present Draft Base Plan at October LTTIWG • Finalize Base Plan and Post January 2009