An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind Indiana 2008Indianapolis June 17-18 By : Jamal Alsawalhi

  2. In my presentation • Purpose of conference • 20% Wind Energy Plan • Wind Energy in Indiana • Conclusion

  3. Sponsors • Sponsored by:- • Indiana Wind Working Group • The Indiana Office of Energy & Defense Development • Purdue University • Partially funded by National Renewable Energy Laboratory

  4. Some Companies Involved in the Conference • Indiana Utility Regulatory Commission • IMPA • Duke Energy • Indiana Power and Light (IPL) • GE Energy • Hoosier Environmental Council • White Construction

  5. Some Speakers • Lt. Governor Becky Skillman • Larry Flower, National Technical director of Wind Powering America • Joan Wealing, past president of Benton County Advisory Plan Commission • Richard Benedict, Indianapolis Power and Light (IPL) • Diane Jenner, Duke Energy

  6. Purpose of Conference • Highlight the great wind energy opportunities in IN • Talk about current wind energy projects taking place in IN and other states • Discuss potential challenges and solutions regarding those projects

  7. Why Wind Energy • High oil prices • Environmental Benefits • Economical Benefits

  8. US Lagging Other Countries for Wind as a Percentage of Electricity Consumption

  9. U.S. Leads World in Annual Wind Capacity Additions; Third in Cumulative Capacity

  10. 20% Wind Energy by 2030 • This will create many job opportunities in IN and other states. • According to Paul Cummings 300GW is needed to meet the 20% plan by 2030 • http://www.20percentwind.org/

  11. Key challenges for the 20% plan • Production Tax Credit (PTC) : 1.5 cents/ KWh for the first ten years of renewable energy facility's operation. It expires in December 31 2008 • Transmission Lines • Materials • Trained Labor • Time • Public Acceptance

  12. IN and Wind Energy • Lt. Governor Becky Skillman announced that IN will supply 530 MW of wind energy by the end of 2008 • Two main Projects: • Benton County Wind Farm (130.5MW) • Fowler Ridge Wind Farm (399.6MW) • http://www.awea.org/projects/

  13. January 2006

  14. January 2006

  15. January 2006

  16. IN Current Power Plants • In 2006 IN Produced 3.2% of electricity in the US • Power plants are aging and demand for energy increasing • Need both Coal and Wind

  17. Environmental Benefits • Reduction of SOx, NOx and CO2 gasses • No Water

  18. Public Acceptance • Landowners concerns • The government, landowners and developers should work together • In general communities like the one in Benton County are looking forward for wind energy

  19. Conclusion • The purpose of the conference was to discuss why wind energy is important and discuss current projects in IN • 20% Wind Energy plan is possible • Unfortunately , No discussion regarding electric machinery involved