90 likes | 100 Views
API SC 10, Work Group 13 Update:. Sub-Committee 10 WG 13 June 28, 2017. Revision of 10 TR1, Cement Sheath Evaluation. Agenda : Wed, June 28 th (2:00 PM – 2:30 PM) WG Charge WG Membership Update on Progress Discussion about how 10TR1 will be used by users
E N D
API SC 10, Work Group 13 Update: Sub-Committee 10 WG 13 June 28, 2017 • Revision of 10 TR1, Cement Sheath Evaluation
Agenda: Wed, June 28th (2:00 PM – 2:30 PM) • WG Charge • WG Membership • Update on Progress • Discussion about how 10TR1 will be used by users - How much logging tool information and where • Next Steps • Adjourn
Work Group Charge: Update 10TR1 Cement Sheath Evaluation: Include latest logging technology Include cement job execution data interpretation Include cement evaluation log data interpretation Include other evaluation techniques
WG Volunteers: • Gunnar DeBruijn (Schlumberger) Abe Vereide (BP) • Glen Benge (Benge Consulting) Pavel Shaposhnikov (Schlumberger) • Erick Cunningham (BP) David Stiles (ExxonMobil) • Shailesh Dighe (Baker) Antonio Bottiglieri (Baker) • Alan Parlipiano (Hess) Joe Shine (Aramco), • Doug Patterson (Baker) Gary Frisch (Halliburton) • Glenn Donovan (Shell) Dan Mueller (ConocoPhillips) • Luis Padilla (Chevron) Jerry Calvert • Additional volunteers?
Progress • Two drafting meetings • Table of Contents – • Surface observations included • Generic Acoustic Logging • Specific Tools move to the Annex
Tools Specifics to Annex • ToolPages • CBL 13 • CBT 3 • SBT 5 • SBL 7 • Ultrasonic 21 • (CAST V + USIT) • Isolation Scanner 15
How Will Industry use the document? • Drilling Engineers ? • Production Engineers ? • Well Integrity Engineers ? • Well Owners ? • New Engineers ? • Regulators ? • Abandonment Engineers ?
Minutes • Called to order 2:01 pm June 28 • Reviewed WG Charge • Reviewed WG Membership • Updated the progress of the document • Discussed how the document will be used • - captured notes on useful items to include – see slide 8 • Adjourn 2:25 pm