160 likes | 323 Views
Maintainer. Operator. AFQT. Workload. Reading Grade Level. Personnel Characteristics. IMPRINT Reports Current and Future Development. Charneta Samms Operations Analysis Team Integration Methods Branch US Army Research Laboratory csamms@arl.army.mil (410) 278-5877. IMPRINT.
E N D
Maintainer Operator AFQT Workload Reading Grade Level Personnel Characteristics IMPRINT ReportsCurrent and Future Development Charneta Samms Operations Analysis TeamIntegration Methods BranchUS Army Research Laboratorycsamms@arl.army.mil (410) 278-5877
IMPRINT • Powerful tool for estimating system performance as a function of human performance • Rendered useless if analyst can not interpret the data FOCUS: Accentuate the strengths of IMPRINT by redesigning and developing analysis friendly reports
Version 6 Advanced Report Screen VACP (Goal) Report Screen
Version 6 Reports Crystal Reports!
Version 6 Reports • Good measures of overall system performance • Limited look into operator workload KEY ISSUES - Plotting Workload Over Time - No report to show operator activity during points of high workload(especially in VACP/Goal)
30 20 10 30 15 10 5 20 10 15 10 5 Version 6 Workload Chart
Data plotted from res file Data plotted from overload report Advanced Reports Fake it - Operator Overload Report with workload threshold set to zero Only reports workload when a task begins, not when one ends.
New Report Specifications • Report Specs are written • User chooses time standard • Each report available in all operator modes • Operator Activity Report • Operator Workload Report • Operator Workload Chart • Snapshots Report • Task Change Report • Task Data Report
VACP/Goal Function Name Task Name Beginning Time Ending Time Operator Advanced Function Name Task Name Beginning Time Ending Time Operator ALREADY AVAILABLE Operator Activity Report
VACP/Goal Time Overall Workload Visual Auditory Cognitive Psychomotor Function Name Task Name Advanced Time Overall Workload Total Single Task Demands Intra Channel Conflicts Inter Channel Conflicts Visual Auditory Cognitive Speech Motor Function Name Task Name Operator Workload Report
VACP/Goal Function Name Task Name Time of change Reason for change Consequence of Failure Action Taken Time Degraded Accuracy Degraded New Task Starts Mission Fails Task Repeats Advanced Function Name Task Name Time of change Reason for change Workload Threshold Exceeded Consequence of Failure Action Taken: Task Dropped Operator Changed Time Degraded Accuracy Degraded New Task Starts Mission Fails Task Repeats Task Change Report • a particular workload strategy drops a task • a particular workload strategy changes the operator of a task • a consequence of failure executes
Task Data and Snapshots • Task Data Report • Similar to Review Task Data but includes • Release conditions • Beginning and Ending effects • Decision node data • Easy way to capture model inputs for documentation • Snapshots • Formatted results vs. raw data files
Version 7 Updates • Operator Workload Report • Available in VACP/Goal • Workload Chart • Available in VACP, Goal and Advanced • Snapshots • Available in Goal and Advanced • Task Status Report (new) • Available in VACP/Goal
Version 7 Reports Reports open directly in Excel Advanced Report Screen Goal (VACP) Report Screen
Version 7 Reports Reports open directly in Excel Default Graphs Addedto both Maintenance Report Screen Personnel Attributes Report Screen
Future Report Development • IMPRINT 7 • Finalizing the look and names of reports • IMPRINT Pro reports • Currently using Version 7 Advanced reports – not optimized • Operator Workload Report • Task Change • Task Data • New reports (incorporating research) • System of System Reports