An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ANDY StatusCommissioning with colliding beams (p+p at s=500 GeV) L.C.Bland, for AnDY 15 February 2011 Time Meeting, BNL

  2. Jet Trigger Commissionedon Saturday 12 February • ADC from Berkeley group (“QT”) has FPGA used to form 17-bit sum of 12-bit ADC from each of 32 channels • 32-bit data from four QT per HCal module transferred to second FPGA board from Berkeley (DSM), where 19-bit sum of four terms is made • Threshold on 19-bit sum is then used as trigger • HCal energy scale still to be determined RHIC clock tick before trigger RHIC clock tick after trigger

  3. Jet Trigger Events • Select from jet-trigger events for HCal “high-tower” to be centered in module • Display for each detector of each module the ADC count as color scale (black=greatest count yellow=lowest count) • Events look “jetty”, as expected

  4. Issues and Plansfor next access possibility and beyond • Resolve a few remaining single-channel issues • Reduce HCal gain • We are in “production” now with a jet trigger >29M jet events recorded since Sunday. • No significant on luminosity at IP6,8 yet • Following access, in coming week… • ECal final calibration • Commission additional triggers

  5. Backup

  6. Schematic of detector for Run-11 • Equipment in place: • HCal is two existing 9x12 modules from E864 (NIM406,227) • ECal are two small lead-glass modules from BigCal at JLab • BBC (from PHOBOS) and ZDC • Preshower is newly constructed scintillator arrays • Goals: • Establish impact of 3IR operation on PHENIX/STAR luminosity • Calibrate HCal • relative gain via cosmic-ray m • absolute energy scale via r,L,KS… • Measure hadronic backgrounds to benchmark simulations • Measure jet analyzing power (Lint~10 / pb, P=50%)

  7. Trigger/DAQ electronics Left/right symmetric HCal Left/right symmetric ECal Blue-facing BBC Left/right symmetric preshower Beryllium vacuum pipe IP2 in January, 2011Run-11 Staging of ANDY See http://hena.lbl.gov/IP2/Business/status/<date> for pictures of progress