340 likes | 714 Views
IEEE 802.11 TGbd Mar 2019 Agenda. Date: 2019-01-24. Author:. IEEE 802.11 TGbd Meeting. Vancouver, Canada Mar 11-15, 2019 Chair: Bo Sun (ZTE) Vice Chair: Hongyuan Zhang (Marvell), Joseph Levy (InterDigital) Secretary: James Lepp (BlackBerry)
E N D
IEEE 802.11 TGbd Mar 2019 Agenda Date: 2019-01-24 Author: Bo Sun (ZTE)
IEEE 802.11 TGbd Meeting Vancouver, Canada Mar 11-15, 2019 Chair: Bo Sun (ZTE) Vice Chair: Hongyuan Zhang (Marvell), Joseph Levy (InterDigital) Secretary: James Lepp (BlackBerry) Tech Editor: Bahar Sadeghi (Intel) Bo Sun (ZTE)
Meeting Protocol, Attendance, Voting & Document Status • Please announce your affiliation when you first address the group during a meeting slot • Cell Phones to be silent or Off • Register your attendance via https://imat.ieee.org while on meeting SSID (e.g. Verilan-secure) • Make sure your badges are correct • If you plan to make a submission be sure it does not contain company logos or advertising • Questions on Voting status, Ballot pool, Access to Reflector, Documentation, Member’s Area • Contact Jon Rosdahl – jrosdahl@ieee.org Bo Sun (ZTE)
Patent Policy and Other Guidelines • Following 5 slides Bo Sun (ZTE)
Participants, Patents, and Duty to Inform • Participants shall inform the IEEE (or cause the IEEE to be informed) of the identity of each holder of any potential Essential Patent Claims of which they are personally aware if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents • Participants should inform the IEEE (or cause the IEEE to be informed) of the identity of any other holders of potential Essential Patent Claims Early identification of holders of potential Essential Patent Claims is encouraged Slide #1 Bo Sun (ZTE)
Ways to Inform IEEE • Cause an LOA to be submitted to the IEEE-SA (patcom@ieee.org); or • Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible; or • Speak up now and respond to this Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance, please respond at this time by providing relevant information to the WG Chair Slide #2 Bo Sun (ZTE)
Patent Related Information The patent policy and the procedures used to execute that policy are documented in the: • IEEE-SA Standards Board Bylaws(http://standards.ieee.org/develop/policies/bylaws/sect6-7.html#6) • IEEE-SA Standards Board Operations Manual(http://standards.ieee.org/develop/policies/opman/sect6.html#6.3) Material about the patent policy is available at http://standards.ieee.org/about/sasb/patcom/materials.html If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org Slide #3 Bo Sun (ZTE)
Other Guidelines for IEEE WG Meetings • All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. • Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. • Don’t discuss specific license rates, terms, or conditions. • Relative costs, including licensing costs of essential patent claims, of different technical approaches January be discussed in standards development meetings. • Technical considerations remain primary focus • Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. • Don’t discuss the status or substance of ongoing or threatened litigation. • Don’t be silent if inappropriate topics are discussed … do formally object. --------------------------------------------------------------- See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Slide #4 Bo Sun (ZTE)
Participation in IEEE 802 Meetings • All participation in IEEE 802 Working Group meetings is on an individual basis • Participants in the IEEE standards development individual process shall act based on their qualifications and experience. (https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf section 5.2.1) • IEEE 802 Working Group membership is by individual; “Working Group members shall participate in the consensus process in a manner consistent with their professional expert opinion as individuals, and not as organizational representatives”. (http://ieee802.org/PNP/approved/IEEE_802_WG_PandP_v19.pdf section 4.2.1) • You have an obligation to act and vote as an individual and not under the direction of any other individual or group. Your obligation to act and vote as an individual applies in all cases, regardless of any external commitments, agreements, contracts, or orders. • You shall not direct the actions or votes of any other member of an IEEE 802 Working Group or retaliate against any other member for their actions or votes within IEEE 802 Working Group meetings, see https://standards.ieee.org/develop/policies/bylaws/sb_bylaws.pdf section 5.2.1.3 and http://ieee802.org/PNP/approved/IEEE_802_WG_PandP_v19.pdf section 3.4.1, list item x By participating in IEEE 802 meetings, you accept these requirements. If you do not agree to these policies then you shall not participate. Slide #5 Bo Sun (ZTE)
Agenda items for the week • Call for order and appoint secretary • IEEE-SA policies and IPR policies • Agenda Agreement • Approve TGbd meeting minutes • TGbd selection procedure discussion • Liaison update • Presenting of technical submissions for the week • TG timeline review • Teleconference Plan • Any other business • Adjourn Bo Sun (ZTE)
Technical Submissions for the Week • 11-19/0293, PHY designs for NGV, Yujin Noh (Newracom) • 11-19/0310, Considerations on NGV PHY design, Ioannis Sarris (u-blox) • 11-19/0311, Simulation of NGV PHY, Ioannis Sarris (u-blox) • 11-19/0319, CAM statistics analysis for simulations, Friedbert Berens (FBConsulting) • 11-19/0320, Simulation of multi-channel interference, Onn Haran (Autotalks) • 11-19/0332, PHY Design for 11bd, Dongguk Lim (LGE) • 11-19/0346, LDPC Investigation for 11bd, Pashant Sharma, (Marvell) • 11-19/0342, 11bd Frame Format, Rui Cao (Marvell) • 11-19/0343, Modulation Scheme for 11bd Range Extension, Jianhan Liu (Mediatek) • 11-19/0341, NGV Backward Interoperability: Follow-up, Rui Cao (Marvell) • 11-19/0349, NGV indication in legacy unicast PPDU, Liwen Chu (Marvell) • 11-19/0364, Performance analysis of outer RS coding scheme, Stephan Sand (German Aerospace Center (DLR)) • 11-19/0365, Consideration on Positioning with 802.11bd, Stephan Sand (German Aerospace Center (DLR)) • 11-19/0366, 20MHz Channel Access in 11 bd, Insun Jang (LG Electronics) • 11-19/0368, Channel usage in NGV, Hanseul Hong (Yonsei Univ.) • 11-19/0082, Interoperable Approach for NGV New Modulations, Michael Fischer (NXP) • 11-19/0369, physical-layer-encoding-for-interoperable-ngv-new-modulations, Alessio Filippi (NXP) • 11-19/0370, adaptation-mechanisms-for-interoperable-ngv-new-modulations, Alessio Filippi (NXP) • 11-19/0371, fading-channel-models-for-6ghz-ngv-simulations, Alessio Filippi (NXP) • 11-19/0375, Frame Aggregation, James Lepp (BlackBerry) • 11-19/0376, Rate Buckets, James Lepp (BlackBerry) • 11-19/0393, simulation of potential PHY technology for NGV, Yonggang Fang (ZTE) Bo Sun (ZTE)
TGbd Sessions in the week Bo Sun (ZTE)
Meeting Slot #1 (adhoc) Agenda Monday AM1 8:00 ~ 10:00 • Call for order • Appoint active secretary • IEEE-SA policies and IPR policies • Agenda agreement • TGbd selection procedure • 11-19/0030r5, 802.11bd selection procedure, Barhar Sadeghi (Intel) • Liaison update • 11-18/2044, draft reply ls from 802.11 to wfa, Joseph Levy (InterDigital) • 11-18/2097, liaison from sae dsrc tc re ngv use cases and requirements • 11-19/0027, 2019-01 Liaison response from IEEE 1609 re: NGV Use cases and requirements • Presentation of technical submissions for the week • Recess Bo Sun (ZTE)
SP #1 • Which of the following motion rules do you support for removing a feature from SFD? • A: 50% - Majority support • B: 75% - Minor support Bo Sun (ZTE)
SP #2 • Do you support deleting the following sentence from the 11bd selection procedure document (11-19/0030r5)? “The editorial changes to the 802.11bd Draft Spec document shall not require a motion.” Y: 49 N: 1 Bo Sun (ZTE)
Meeting Slot #2 Agenda Tuesday PM1 13:30 ~ 15:30 • Call meeting to order • IEEE-SA meeting policies and Patent policy • Approve of meeting minutes • Motion of selection procedure document • FRD skeleton • https://mentor.ieee.org/802.11/dcn/19/11-19-0440-00-00bd-802-11bd-proposed-functional-requirements-document.doc • SFD skeleton • https://mentor.ieee.org/802.11/dcn/19/11-19-0441-00-00bd-802-11bd-proposed-specification-framework-document.docx • Call for volunteer for liaison response to IEEE 1609 • John Kenney as the contact of developing the liaison response to IEEE 1609 • Presentation of the technical submissions for the week • Recess Bo Sun (ZTE)
Approval of NGV SG Minutes ( Jan meeting and Feb CC minutes) • Approve TGbd meeting minutes: • https://mentor.ieee.org/802.11/dcn/19/11-19-0283-01-00bd-tgbd-jan-feb-mar-2019-teleconference-minutes.docx • https://mentor.ieee.org/802.11/dcn/19/11-19-0228-01-00bd-tgbd-jan-2019-meeting-minutes.docx • Move: James Lepp - Second: Bahar Sadeghi • Passed unanimous Bo Sun (ZTE)
Motion for selection procedure document • Move to accept 11-19/0030r6 as TGbd’s selection procedure document • Moved: Bahar Sadeghi • Seconded: Yonggang Fang • Passed unanimous Bo Sun (ZTE)
Meeting Slot #3 Agenda Tuesday EVE 19:30 ~ 21:30 • Call meeting to order • IEEE-SA meeting policies and Patent policy • Motion for FRD baseline • Motion for SFD baseline • Review Liaison response • https://mentor.ieee.org/802.11/dcn/19/11-19-0437-00-00bd-draft-reply-ls-from-802-11-to-vt-its-1609-wg.docx • Presentation of the technical submissions for the week • Recess Bo Sun (ZTE)
Motion for FRD • Move to accept 11-19/0440r0 as the baseline of TGbd’s Functional Requirement Document. • Moved: Bahar Sadeghi • Seconded: Rui Cao • Passed unanimous Bo Sun (ZTE)
Motion for SFD • Move to accept 11-19/0441r0 as the baseline of TGbd’s Spec Framework Document. • Moved: Bahar Sadeghi • Seconded: Rui Cao • Passed unanimous Bo Sun (ZTE)
Liaison Contact Appointment • Appoint John Kenney as the liaison contact with IEEE VT/ITS 1609 WG Bo Sun (ZTE)
Meeting Slot #4 Agenda Thursday AM2 10:30 ~ 12:30 • Call meeting to order • IEEE-SA meeting policies and Patent policy • Motion on Liaison response • https://mentor.ieee.org/802.11/dcn/19/11-19-0437-01-00bd-draft-reply-ls-from-802-11-to-vt-its-1609-wg.docx • FRD update content • https://mentor.ieee.org/802.11/dcn/19/11-19-0511-00-00bd-802-11bd-proposed-functional-requirements.doc • Presentation of the technical submissions for the week • Recess Bo Sun (ZTE)
Motion for Liaison Response • Move to recommend the IEEE 802.11 WG to send 11-19/0437r3 to IEEE VT/ITS 1609 WG and CC as addressed and grant the WG chair editorial privilege • Moved: Joseph Levy • Seconded: John Kenney • Result: 30Y/0N/1A • Motion passed Bo Sun (ZTE)
Meeting Slot #5 Agenda Thursday PM2 16:00 ~ 18:00 • Call meeting to order • IEEE-SA meeting policies and Patent policy • Presentation of the technical submissions for the week • Motions for FRD and SFD (after 11-19/0341) • Motion booklet: 11-19/0514 • TG timeline review • Teleconference plan • Presentation of the rest technical submissions for the week • TGbd closing report • Adjourn Bo Sun (ZTE)
FRD&SFD Motion #1 • Move to update the 11bd FRD according to the changes captured in document 11-19/0511r1. • Moved: Bahar Sadeghi • Seconded: Joseph Levy • Result: Passed unanimous Bo Sun (ZTE)
FRD&SFD Motion #2 • Move to add the following text to section 3 in 11bd SFD. • “ 11bd PPDU format includes L-STF, L-LTF, and L-SIG fields as shown in Figure 3.x • L-STF means short training field of 11p. • L-LTF means long training field of 11p. • L-SIG means signal field of 11p.” • Moved: Dongguk Lim • Seconded: Hongyuan Zhang • Result: 33Y/0N/9A, passed L-STF L-LTF L-SIG 11bd PPDU Figure 3.x 11bd PPDU format Bo Sun (ZTE)
FRD&SFD Motion #3 • Move to add the following text to section 3 in 11bd SFD. • “11bd supports the 10MHz bandwidth PPDUs. • 11bd supports the 20MHz bandwidth PPDUs. ” • Mover: Dongguk Lim • Second: Hongyuan Zhang • Result: Passed unanimous Bo Sun (ZTE)
FRD&SFD Motion #4 • Move to add the following text to section 3 in 11bd SFD. • “In20MHz bandwidth, L-STF, L-LTF, and L-SIG for 10MHz PPDU are duplicated asshown in the figure below.” • Mover: Dongguk Lim • Second: Hongyuan Zhang • Result: 25Y/0N/19A, passed 10MHz L-SIG L-STF L-LTF 10MHz L-STF L-LTF L-SIG 11bd PPDU Bo Sun (ZTE)
FRD&SFD Motion #5 • Move to add the following text into Section 3 of SFD • “11bd amendment shall support LDPC” • Mover: Prashant Sharma • Second: Hongyuan Zhang • Result: Passed unanimous Bo Sun (ZTE)
FRD&SFD Motion #6 • Move to add the following text into Section 3 of SFD • “An 11bd STA shall be capable of the following operations: • To decode 11p PPDUs with TBD receive sensitivity threshold (TBD value is -85dBm or lower). • To transmit PPDU format up on request from upper layer, the PPDU format can be either 11p PPDU or 11bd PPDU.” • Mover: Rui Cao • Second: Hongyuan Zhang • Result: 27Y/0N/14A, passed Bo Sun (ZTE)
FRD&SFD Motion #7 • Move to add the following text into Section 3 of SFD • “An 11bd STA shall indicate the NGV capability in MAC level, when transmitting an 11p PPDU” • Mover: Rui Cao • Second: Hongyuan Zhang • Result: passed unanimous Bo Sun (ZTE)
Timeline (No change) • PAR approved Dec 2018 • First TG meeting Jan 2019 • D0.1 Sept 2019 • D1.0 Letter Ballot Nov 2019 • D2.0 LB recirculation Mar 2020 • Form Sponsor Ballot Pool May 2020 • D3.0 LB recirculation May 2020 • D3.0 unchanged recirculation July 2020 • Initial Sponsor Ballot (D4.0) Sept 2020 • Final 802.11 WG approval July 2021 • 802 EC approval July 2021 • RevCom and SASB approval Sept 2021 Bo Sun (ZTE)
Teleconference Plan • Date: Mar 26, Apr 23, May 21 • Time: 10:00am ~ 11:59am, ET • Date: Apr 9, May7 • Time: 6:00pm ~ 8:00pm, ET Bo Sun (ZTE)