Construction Industry Efforts and Capabilities to Support PBES Deployment.

William G. Duguay J.D. Abrams, L.P. Construction Industry Efforts and Capabilities to Support PBES Deployment. Learning Outcomes. Current market conditions Efforts under way to support PBES How other industries do their version of ABC Barriers to implementation Why this should be good.

Download Presentation

Construction Industry Efforts and Capabilities to Support PBES Deployment.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. William G. Duguay J.D. Abrams, L.P. Construction Industry Efforts and Capabilities to Support PBES Deployment.

  2. Learning Outcomes • Current market conditions • Efforts under way to support PBES • How other industries do their version of ABC • Barriers to implementation • Why this should be good

  3. Section 1How Current Market Conditions may Affect ABC and PBES

  4. Current Market Conditions and their Effects on: 1. Lower Bid pricing 2. Overall Lower Bid Volumes 3. Growing International presence • Will continue to drive: • Adaptability • Innovation • New/modified uses for existing equipment • Bringing new companies into every market • Acceptance of European, Asian technology

  5. An estimated 146,000 bridges need work • Every Agency is strapped for funding, and are looking for: • New funding streams • New delivery methods • New designs • Raising expectations of performance

  6. Section 2Industry Efforts to Support PBES

  7. What are some of the industry efforts under way to support PBES? • Adaptive use of technologies in other industries • Collaboration with Universities for research • Industry Outreach and Transportation Forums

  8. Major Markets served by the Heavy Lift Industry Oil & Gas Nuclear Power Fossil Power Wind Energy General Construction Heavy Civil Project Cargo Logistics

  9. Other Industries are used to moving modular units

  10. Efforts underway to support PBESBay Bridge East End Tie In

  11. Redland Rd OR38

  12. Bay Bridge West Tie in

  13. Pioneer Crossing, UT

  14. Scaled for everyday use

  15. Pieces can be scaled to adapt to conditions and needs

  16. Precast segmented abutment

  17. Precast columns, caps and abutment

  18. PBES Doesn’t have to be Huge

  19. PBES can be something other than steel or concrete HCB Bridge Elements erected using standard equipment

  20. Adaptive reuse of Technology and Equipment

  21. Marino Proposed Concept

  22. International Technologies

  23. Industry is working upstream and downstream

  24. Industry Supported ResearchUniversity of Washington Working with a Highways for Life Contract, a simple footing detail was developed: “It has definitely been a team effort, with people from all the necessary disciplines actively involved” This included WSDOT, local AGC members and local engineering firms

  25. HCB Laboratory Validation

  26. Earthquake testing SUNY Buffalo

  27. Precast Overhangs

  28. From Design, to Lab to Production

  29. Transportation Forums • Fast 14 in Massachusetts $78M now underway • Columbia River Bridges $3.6B • Tappan Zee Bridge $8-16B • Ohio River Bridges Project $4B • Epping bridge replacement

  30. Section 3Is ABC/PBES unique to Transportation?

  31. Adapt Delivery methods from other industries: Manufacturing and Commercial Buildings version of ABC: • Lean Construction • Do more with less • Bring Manufacturing Principles into Construction, focus on the cycle from identification of need thru delivery • Each step of the process is monitored and improved • Maximize field safety, quality and productivity • BIM going horizontal

  32. Section 4What could the barriers to Implementation be?

  33. Projects don’t need to be huge • Contractors and Vendors participate in design and constructability reviews for projects of every size • Local meetings emphasize local abilities, drawing on national resources when needed

  34. Other perceived barriers • Lack of agreement on need for new methodology • Is the Risk suitable for the Reward • Is the new method going to be part of the Agencies policy going forward • Does the bridge portion drive the overall critical path • Will money spent on PBES be at the expense of other portions of an Agencies Program

  35. Each of these barriers can be resolved thru communicating the goals of the project • The Transportation Industry has many successful projects of: • Varying dollar size and local • Type of construction and delivery • That solved unique needs effectively

  36. Section 5Why ABC and PBES can Benefit Industry

  37. 2 Ways • Maximizing the Delivery Process PBES can allow: • Significant bridge work activities be moved off of the Critical Path • Them to be moved out of traffic • These activities be consolidated and reduced to minimize the impact on the community • Safety, quality, durability, adaptability of our Infrastructure be a larger part of our message

  38. 2nd: Our Industry Competes for Funding • Transportation needs are well known • As Funding becomes available, the traveling public will not allow extensive added congestion due to these improvements

  39. How do we improve the highway system to a level of quality the public expects in a timely fashion? • Do as much as possible at times and in locations that minimize interference • Where that’s not an option, do those portions as safely and as quickly as possible

  40. By using PBES in appropriate situations, we can effectively demonstrate how adaptable the Transportation Industry is, to: • Maintain the value of our nations transportation investment • Continue to improve the effectiveness of our system to provide safe and reliable transportation at the local and national level

  41. Module Conclusion

  42. Questions? www.agc.org