An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Completed System Versatility, Simplicity, Cost Effectiveness

  2. The Beginning of the System CZ Double Skin, Steel Tank

  3. Fabrication Process (1) PFC External Reinforcement Ring Mounting Brackets For Canopy Supports Goal Post (Canopy Support) 1 of 3 options For Canopy Support

  4. Fabrication Process (2) Coming together of the supporting elements Integral Cradle Support and Restraint Electrical Isolation for Cathodic Protection

  5. Fabrication Process (3) Slave Cradle Support Concrete Reinforcing Bars and Mesh Completed Tank Fabrication

  6. Options Available • - Canopy Support Options • - Top Trough Assembly • - Chamber Assembly and Fit Out • - UPP First • CZ are pleased to provide the client with any options above or bespoke design. • For maximum system benefit – do as much shop fit out as the layout will allow including pipe chamber, seals, tank top fittings, piping

  7. Trough System - The Outside Scene

  8. Trough System - The Inside Scene (1)

  9. Trough System - The Inside Scene (2)

  10. Trough System - Sealed Access Polyethylene Cover with Pump Cut-Outs Fusion Welded Seals

  11. Trough System • Major Benefits • Reduces on-site work, resulting in substantially reduced site costs • High degree of fabrication integrity • Fully tested at works prior to despatch • Substantial reduction in site works time

  12. Chamber Assembly and Fit Out Typical Steel Fitting Arrangement UPP Connections with Fusion Seals

  13. UPP First The totally retractable pipe system. The arrangement above shows possible layouts. Housing pipe and suctions can be pre-fitted at works where layout permits. This is a viable alternative where a trough is not preferred.

  14. On The Way

  15. Over ‘she’ goes, Crane lift on site

  16. Levelling by jacking method Gently does it, Lowering into excavation Positioned in minutes

  17. Innovations The island framework and accessories* are installed over the tank. • pump frame • manway covers • filling connections *

  18. Advantages: Reduction of the work duration The critical path on the site is more secure Less specialists are required on site Easy maintenance Economical and financial gain Compact underground equipments Disadvantages: Let us know if you find one!!!! Advantages and Disadvantages

  19. Typical Planning (1) Page 1

  20. Typical Planning (2) Page 2

  21. Typical Planning (3) Page 3

  22. Plan View

  23. Plan View