290 likes | 301 Views
The Completed System. Versatility, Simplicity, Cost Effectiveness. The Beginning of the System. CZ Double Skin, Steel Tank. Fabrication Process (1). PFC External Reinforcement Ring. Mounting Brackets For Canopy Supports. Goal Post (Canopy Support) 1 of 3 options For Canopy Support.
E N D
The Completed System Versatility, Simplicity, Cost Effectiveness
The Beginning of the System CZ Double Skin, Steel Tank
Fabrication Process (1) PFC External Reinforcement Ring Mounting Brackets For Canopy Supports Goal Post (Canopy Support) 1 of 3 options For Canopy Support
Fabrication Process (2) Coming together of the supporting elements Integral Cradle Support and Restraint Electrical Isolation for Cathodic Protection
Fabrication Process (3) Slave Cradle Support Concrete Reinforcing Bars and Mesh Completed Tank Fabrication
Options Available • - Canopy Support Options • - Top Trough Assembly • - Chamber Assembly and Fit Out • - UPP First • CZ are pleased to provide the client with any options above or bespoke design. • For maximum system benefit – do as much shop fit out as the layout will allow including pipe chamber, seals, tank top fittings, piping
Trough System - Sealed Access Polyethylene Cover with Pump Cut-Outs Fusion Welded Seals
Trough System • Major Benefits • Reduces on-site work, resulting in substantially reduced site costs • High degree of fabrication integrity • Fully tested at works prior to despatch • Substantial reduction in site works time
Chamber Assembly and Fit Out Typical Steel Fitting Arrangement UPP Connections with Fusion Seals
UPP First The totally retractable pipe system. The arrangement above shows possible layouts. Housing pipe and suctions can be pre-fitted at works where layout permits. This is a viable alternative where a trough is not preferred.
Over ‘she’ goes, Crane lift on site
Levelling by jacking method Gently does it, Lowering into excavation Positioned in minutes
Innovations The island framework and accessories* are installed over the tank. • pump frame • manway covers • filling connections *
Advantages: Reduction of the work duration The critical path on the site is more secure Less specialists are required on site Easy maintenance Economical and financial gain Compact underground equipments Disadvantages: Let us know if you find one!!!! Advantages and Disadvantages
Typical Planning (1) Page 1
Typical Planning (2) Page 2
Typical Planning (3) Page 3