1 / 9

Nameplate Capacity

Nameplate Capacity. 300.000 t/y ( feed gasoil ) 260.000 t/y ( feed VN IQ120) (1 compression line ) (822 t/d x 365 d/y). Energetic Index. 7200 Kcal/Kg ethylene (1 compression line ). Furnaces. N° 4 Selas furnaces duty 43x10 6 Kcal/h

pascal
Download Presentation

Nameplate Capacity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NameplateCapacity 300.000 t/y ( feedgasoil) 260.000 t/y (feed VN IQ120) (1 compressionline) (822 t/d x 365 d/y)

  2. EnergeticIndex 7200 Kcal/Kg ethylene (1 compressionline)

  3. Furnaces N° 4 Selasfurnaces duty 43x106 Kcal/h N° 5 Foster Wheelerfurnaces duty 15x106 Kcal/h N° 2 Foster WheelerEthanerecyclefurnaces duty15x106 Kcal/h.

  4. Feedstocks • Gasoil 32% • Virgin Naphta 54% • Raffinate 13% • LPG • C5Aromatics cut 1% • Condensate on availability

  5. Charge Gas Compressor • Compressor C1Electric Driver 14 MWatt 260.000 t/y ofethylene • Compressor C6 Turbine driver 14 MWatt 186.000 t/y ethylene

  6. Medium temperature Section • Light endsSplittercolumn 1500 daysreboiler 200 days • Depropanationcolumncolumn 1000 days • reboiler 200 days • CausticTowerCausticconcentration 4%Causticconsumption 2 Kg/t ethylene

  7. ColdSection EthyleneSplitter Start up 1986 capacity 300.000 t/y ofethylene AcethyleneReactorsSud Chemiecatalyst G58C Start up 2006Inlet T 50°C I e 60°C II End ofrun T 60°C I e 70°C IIregenerationcycle 210 days molar ratio 1,1 I e 1,7 II MAPD Reactorscatalyst CCI C-31inlet T 75°Cregenerationcycle 4 yearsCatalyst life 28 years

  8. Ethylenechillingcycle Compressor C3 turbine driver Compressor C8electric driver 3,5 MWatt

  9. Chillingcyclewithpropylene Compressor C2backpressure turbineThe backpressure turbine CT-2A has a powerof 9 Mwatt and issuitabletoonecompressionlinerun Compressor C7condensing turbine CT-7 turbine has a powerof 10,5 Mwatt and issuitabletotwocompressionlinesrun

More Related