Xxx Commodity Project Summary. Terminal Block (WS12249) Project. Project Summary E sourcing of component XXX – Current supply chain description General Strategy Consolidate suppliers Localize in final assembly producing country Reduce lead time BCC options
E N D
Terminal Block (WS12249) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
Capacitor (WS ) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
Connector (WS21733) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
Switch (WS2729x) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
EH Bare Copper Wire (WS23550) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
EH Cordsets (WS23559) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
Magnet Wire (WS23567) Project ask Rob • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
WSRD Negotiation w/ Square D • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
CH Circuit Breaker Negotiation w/ CH Canada • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact
Future state WSR and WSRD Current / Future States: Freight 1 Freight 2 Current State MX Co SQD Co Memphis • EGS Benefits • Reduce FG Inv cost to (est.) 40% at both Co and Memphis • INV cost: Product $ + Carrying $ (15% x product) • 2) Reduce Leadtime to (est.) 66% (From 6wks to 4wks) • 3) Reduce Freight cost to (est.) 30% x (F1+ F2) • 4) Eliminate F1 and F2 cost • 5) Eliminate material handling at Co • 6) Double orders • Impact to Co: • Increase component INV by 50% because of SQD larger orders • Square D Assembly: • Instruction Sheet • Label • Process check (check List from Co) • RRR • Transition (from Co to SQD) • SQD Benefits • Double orders and more profits • Grow business • Reduce Leadtime/better service customers • Win-win plan • Talking points: • SQD would have increase FG INV cost • SQD would have to charge labor for assembly • TBDs: • Freight 1 and freight 2 • FG INV cost at Co and Memphis