An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Xxx Commodity Project Summary

  2. Terminal Block (WS12249) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  3. Capacitor (WS ) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  4. Connector (WS21733) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  5. Switch (WS2729x) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  6. EH Bare Copper Wire (WS23550) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  7. EH Cordsets (WS23559) Project • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  8. Magnet Wire (WS23567) Project ask Rob • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  9. WSRD Negotiation w/ Square D • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  10. CH Circuit Breaker Negotiation w/ CH Canada • Project Summary E sourcing of component XXX – Current supply chain description • General Strategy • Consolidate suppliers • Localize in final assembly producing country • Reduce lead time • BCC options • Potential suppliers status and constraints • Supplier Capabilities • Constraints (logistics, technology) • EGS resources needed • Total Supply Chain Impact • Logistics/DPO/Inventory Impact

  11. Future state WSR and WSRD Current / Future States: Freight 1 Freight 2 Current State MX Co SQD Co Memphis • EGS Benefits • Reduce FG Inv cost to (est.) 40% at both Co and Memphis • INV cost: Product $ + Carrying $ (15% x product) • 2) Reduce Leadtime to (est.) 66% (From 6wks to 4wks) • 3) Reduce Freight cost to (est.) 30% x (F1+ F2) • 4) Eliminate F1 and F2 cost • 5) Eliminate material handling at Co • 6) Double orders • Impact to Co: • Increase component INV by 50% because of SQD larger orders • Square D Assembly: • Instruction Sheet • Label • Process check (check List from Co) • RRR • Transition (from Co to SQD) • SQD Benefits • Double orders and more profits • Grow business • Reduce Leadtime/better service customers • Win-win plan • Talking points: • SQD would have increase FG INV cost • SQD would have to charge labor for assembly • TBDs: • Freight 1 and freight 2 • FG INV cost at Co and Memphis