190 likes | 315 Views
MSD II Week 6 Update. P13265: Motorcycle Safety Lighting and Portable Electronics Charging System. Mike: Action Items Status. Lens Covers Incomplete Still waiting on shell Bike Wiring Harness/ Tx Box In Progress (almost complete) Test fit on bike, confirmed fit w/no permanent mods.
E N D
MSD II Week 6 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System
Mike: Action Items Status • Lens Covers • Incomplete • Still waiting on shell • Bike Wiring Harness/ Tx Box • In Progress (almost complete) • Test fit on bike, confirmed fit w/no permanent mods. • Wireless XBee Test • Complete • Captured waveforms from bike for all light sources • Assist Tyler with Shell • In Progress
Mike: Next Steps for Week 7 • Finish board population w/TJ ~5 hrs • Edit/ complete Tech Report ~ 10 Hours • Assist Tyler with Shell~ 10 Hours • Begin lens covers? ~5 hrs
Tyler: Action Items Status • Finish New Mold • In Progress • More, various setbacks, near completion • Shell Assembly • Incomplete: • Pending completion of new shell • Poster Work • Incomplete: • All time this week was dedicated to getting the mold done.
Tyler: Next Steps for Week 7 • Shell/Backpack Assembly ~ 15 Hours • Tech Paper ~ 4 Hours • Complete Assembly Plan ~ 4 Hours • Will be completed as backpack is assembled • Poster Work ~ 6 Hours
Ben: Action Items Status • Electronics box • Finished but must be narrowed before gluing • Quick Connect • Testing was performed this weekend, with the length of the male end confirmed (along with the mounting of the female end).
Ben: Next Steps for Week 7 • Reduce box width- 5 hours • Must reduce the width of the top piece, bottom piece, both short sides, and redrill top in new corners • Install standoffs- ~2 hours • Placement of all standoffs must be precise • Tech paper • I will write my section for Friday
Eric: Action Item Status • MSP430 Development • Incomplete, In Progress, Complete: • Explain • Board Build and Testing • Incomplete, In Progress, Complete: • Explain
Eric: Next Steps for Week 7 • NS #1 ~ # Hours • Explain • NS #2 ~ # Hours • Explain • NS #3 ~ # Hours • Explain
TJ: Action Items Status • Populate PCBs • In Progress: • Should have adapters today and will complete final rework Friday afternoon • Test XBee's in Lab and on Bike • In Progress: • Dev Kit issues resolved with current limiting resistors • Bike signals captures and will be replicated in lab • EDGE Update • In Progress • Site cleanup and more formatting additions
TJ: Next Steps for Week 7 • Populate and Debug PCBs ~ 10 Hours • Finish all rework and go through Test Plan • XBee Lab Test ~ 2 Hours • Replicate motorcycle signals and ensure correct signal transmission • Assemble Tech Paper Rough Draft ~ 5 Hours • Put together segments and add additional information
Killian: Action Items Status • Refine Sketches • Complete • Sketches, done, scanned into photoshop and started to apply gradient. Initial linework for illustrator renderings has begun, need to group sections and start to apply color/gradients • Backpack Assembly • In progress • Cut out a bunch of the cross sections, getting control panel 3-D printed • Poster Layout • In progress • Discussed gameplan with Tyler and Mike
https://www.facebook.com/photo.php?v=10201084405291756&ref=notif¬if_t=video_taghttps://www.facebook.com/photo.php?v=10201084405291756&ref=notif¬if_t=video_tag
Killian: Next Steps for Week 7 • Complete Photoshop and Illustrator Renderings ~ 6 Hours • Just need to finish applying everything and possibly do a few other sketches of inserting items (phone, laptop, tablet) • Assist with Assembly ~ 7 Hours • Help with shell shaping and vacuum forming, painting control panel • Draw up Outlines of Poster, begin inserting text and graphics ~ 3 Hours • Hope to have a pretty set layout by next week
Major Week 7 Action Items • Mike - Complete Tx Box • Tyler - Backpack Assembly • Ben - Finish Electronics box, quick connect • Eric - • TJ - Populate and Debug PCBs • Killian - Renderings and Assembly
Lessons Learned • Mike • Tyler • Make sure to double check other peoples work thoroughly if your work is dependent on theirs. It's not okay to assume the thought of every problem that could arise. • Ben • Double check offset calculations
Lessons Learned cont. • Eric • TJ • SMT population takes a long time and first revisions of boards often need to be reworked and modified for prototyping applications • Killian • You can print two items at once with 3-D printers, 3-D printing quality is very limited in the innovation center