MSD II Week 6 Update

MSD II Week 6 Update. P13265: Motorcycle Safety Lighting and Portable Electronics Charging System. Mike: Action Items Status. Lens Covers Incomplete Still waiting on shell Bike Wiring Harness/ Tx Box In Progress (almost complete) Test fit on bike, confirmed fit w/no permanent mods.

Download Presentation

MSD II Week 6 Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MSD II Week 6 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System

  2. Mike: Action Items Status • Lens Covers • Incomplete • Still waiting on shell • Bike Wiring Harness/ Tx Box • In Progress (almost complete) • Test fit on bike, confirmed fit w/no permanent mods. • Wireless XBee Test • Complete • Captured waveforms from bike for all light sources • Assist Tyler with Shell • In Progress

  3. Mike: Action Items Status

  4. Mike: Next Steps for Week 7 • Finish board population w/TJ ~5 hrs • Edit/ complete Tech Report ~ 10 Hours • Assist Tyler with Shell~ 10 Hours • Begin lens covers? ~5 hrs

  5. Tyler: Action Items Status • Finish New Mold • In Progress • More, various setbacks, near completion • Shell Assembly • Incomplete: • Pending completion of new shell • Poster Work • Incomplete: • All time this week was dedicated to getting the mold done.

  6. Tyler: Next Steps for Week 7 • Shell/Backpack Assembly ~ 15 Hours • Tech Paper ~ 4 Hours • Complete Assembly Plan ~ 4 Hours • Will be completed as backpack is assembled • Poster Work ~ 6 Hours

  7. Ben: Action Items Status • Electronics box • Finished but must be narrowed before gluing • Quick Connect • Testing was performed this weekend, with the length of the male end confirmed (along with the mounting of the female end).

  8. Ben: Next Steps for Week 7 • Reduce box width- 5 hours • Must reduce the width of the top piece, bottom piece, both short sides, and redrill top in new corners • Install standoffs- ~2 hours • Placement of all standoffs must be precise • Tech paper • I will write my section for Friday

  9. Eric: Action Item Status • MSP430 Development • Incomplete, In Progress, Complete: • Explain • Board Build and Testing • Incomplete, In Progress, Complete: • Explain

  10. Eric: Next Steps for Week 7 • NS #1 ~ # Hours • Explain • NS #2 ~ # Hours • Explain • NS #3 ~ # Hours • Explain

  11. TJ: Action Items Status • Populate PCBs • In Progress: • Should have adapters today and will complete final rework Friday afternoon • Test XBee's in Lab and on Bike • In Progress: • Dev Kit issues resolved with current limiting resistors • Bike signals captures and will be replicated in lab • EDGE Update • In Progress • Site cleanup and more formatting additions

  12. TJ: Next Steps for Week 7 • Populate and Debug PCBs ~ 10 Hours • Finish all rework and go through Test Plan • XBee Lab Test ~ 2 Hours • Replicate motorcycle signals and ensure correct signal transmission • Assemble Tech Paper Rough Draft ~ 5 Hours • Put together segments and add additional information

  13. Killian: Action Items Status • Refine Sketches • Complete • Sketches, done, scanned into photoshop and started to apply gradient. Initial linework for illustrator renderings has begun, need to group sections and start to apply color/gradients • Backpack Assembly • In progress • Cut out a bunch of the cross sections, getting control panel 3-D printed • Poster Layout • In progress • Discussed gameplan with Tyler and Mike

  14. https://www.facebook.com/photo.php?v=10201084405291756&ref=notif&notif_t=video_taghttps://www.facebook.com/photo.php?v=10201084405291756&ref=notif&notif_t=video_tag

  15. Killian: Next Steps for Week 7 • Complete Photoshop and Illustrator Renderings ~ 6 Hours • Just need to finish applying everything and possibly do a few other sketches of inserting items (phone, laptop, tablet) • Assist with Assembly ~ 7 Hours • Help with shell shaping and vacuum forming, painting control panel • Draw up Outlines of Poster, begin inserting text and graphics ~ 3 Hours • Hope to have a pretty set layout by next week

  16. Major Week 7 Action Items • Mike - Complete Tx Box • Tyler - Backpack Assembly • Ben - Finish Electronics box, quick connect • Eric - • TJ - Populate and Debug PCBs • Killian - Renderings and Assembly

  17. Lessons Learned • Mike • Tyler • Make sure to double check other peoples work thoroughly if your work is dependent on theirs. It's not okay to assume the thought of every problem that could arise. • Ben • Double check offset calculations

  18. Lessons Learned cont. • Eric • TJ • SMT population takes a long time and first revisions of boards often need to be reworked and modified for prototyping applications • Killian • You can print two items at once with 3-D printers, 3-D printing quality is very limited in the innovation center