220 likes | 230 Views
Detailed recommendations for pre-ballot, balloting, and post-ballot tasks to ensure a smooth voting process. Includes instructions on drafting, balloting types, voter choices, comment categorization, and response protocols.
E N D
TG3 Review Procedure Proposal NOTE: All of these recommendations do not apply to TG votes, but highly are recommended • Pre-Ballot Tasks • Balloting • Post-Ballot Tasks Tom Siep, TMS Consultants
Pre-Ballot Tasks • Ballot timeframe • Schedule backwards from desired processing event • Get specific TG or WG pre-approval for further action if processing event is not plenary • Ballot Package • Draft • Instructions • Voter comment sheet Tom Siep, TMS Consultants
Ballot Draft • Issued in PDF • Change Bar version between this version and the previously balloted version • Clean version • Instructions used by editor to create this version from the last voted version • Line numbers on all pages • Available on website, password protected • All known issues identified Tom Siep, TMS Consultants
Ballot Instructions • ALL 802.15 Letter Ballots are electronic • Dates • Start • End (including time/time zone) • Contact information for ballot return and ACK • Type of Ballot • Voting Options • Comment Types • Comment/Response Status Codes Tom Siep, TMS Consultants
Type of Ballot Technical – The function of the protocol is changed as the result of the affirmation of the ballot Procedural – Passage of the ballot has no impact on the design of interoperable devices Tom Siep, TMS Consultants
The ballot shall provide three choices: Voting Options • Approve (Affirmative). This vote may be accompanied by comments suggesting corrections and improvements. Action on such comments is left to the discretion of the Sponsor. [sponsor = WG = TG] • Do Not Approve (Negative). This vote shall be accompanied by specific reasons in sufficient detail so that the specific wording of the changes that will cause the negative voter to change his or her vote to "approve" can readily be determined. The Sponsor shall obtain written confirmation from each voter that indicates concurrence with any change of his or her vote. Written confirmation can be by letter, fax, or electronic mail. In the absence of reasons for a negative vote, the ballot shall, after a follow-up inquiry, be classified as "no response." • Abstain. This category is provided to allow for ballot returns from members who do not wish to review the document because of conflict of interest, lack of expertise, or other reasons. A reason shall be given for this vote; otherwise, the ballot shall be classified as "no response." Tom Siep, TMS Consultants
Comment Types (1 of 2) • Was • Type • Technical (T) – would cause improper implementation • technical (t) – error in fact, would not cause improper implementation • Editorial (E) – language used is unclear or misleading such that it may cause an improper implementation • editorial (e) – grammatical error not likely to cause improper implementation • Required resolution (Y or N) Tom Siep, TMS Consultants
Comment Types (2 of 2) • Suggest • Technical Required (TR) – Functional error that must be addressed for approval of Draftexample: “all frames must be zero length” • Technical (T) – Non-critical functional errorexample: “hex value is 0x10 (seventeen decimal)” • Editorial Required (ER) – Lack of clarity of text likely to cause improper implementation and must be addressed for approval of Draftexample: “A frame must be discarded subsequently” • Editorial (E) – Non-critical grammatical or spelling errorexample: “A example is provided” Tom Siep, TMS Consultants
Balloting • SHALL NOT change Draft during a vote • Invalidates vote • If required changes are identified,posting of notation of intent to change – this means another ballot will be required • Make sure chair (WG or TG) pings voters periodically • Requires 50% voters participation • Abstentions count towards participation • 75% approval required for Technical issues Tom Siep, TMS Consultants
Post-Ballot Tasks • Triage of comments • Processing comments • Preliminary resolution • Draft Response to voter • Approval of resolution • Application of changes • Notification of Rejections/changes Tom Siep, TMS Consultants
Comment/Response Status Codes Q • Comment Status • X/received • D/dispatched for consideration • A/accepted • R/rejected • Q/questioned • Response Status • O/open • W/written • C/closed • U/unstatisfied • Z/withdrawn Q Tom Siep, TMS Consultants
Comment Flowchart (1 of 3) Tom Siep, TMS Consultants
Comment Flowchart (2 of 3) Tom Siep, TMS Consultants
Comment Flowchart (3 of 3) Tom Siep, TMS Consultants
Triage of Comments • Combine all comments into a single file • Decide if there is sufficient information in each comment to identify target of that comment • Decide if comment is classified appropriately • Divide ballots into logical groups • Form “tiger teams” to address comments • Charge tiger team to complete processing by a definite date Tom Siep, TMS Consultants
Processing comments • Ad Hoc activity • Address Technical comments first • Review triage decisions • Formulate and document decision Tom Siep, TMS Consultants
Preliminary resolution • TG-level task for “controversial” decisions • One issue per slide • Problem Statement • Commenter’s proposal • Tiger team’s recommendation • Rationale for decision Tom Siep, TMS Consultants
Draft Response to voter • Required for rejections • Recommended for any descriptor change • One letter per voter • Comment as entered • Response from TG Tom Siep, TMS Consultants
Approval of resolution • WG/TG vote (as appropriate) • Technical issue (75% approval) • Vote format • Plenary • Interim • WG • With authorization • Letter Ballot Tom Siep, TMS Consultants
Application of changes • Applied by Section Editors • Supervised by Lead Editor • WG Technical Editor available as an advisor Tom Siep, TMS Consultants
Notification of Rejections/changes • Sent via email • Request for change of vote • Follow-up to WG/TG on any withdrawals of comments Tom Siep, TMS Consultants