140 likes | 163 Views
Meeting of Water Directors 30 Nov/1 Dec 2006. Item 4.1 Progress on Reporting and WISE. Contents. Progress and next steps on compliance – 2010 reporting on WISE (incl 2008 tools) on GIS new mandate. WG D Organisation. WISE Steering Group *. WISE Technical Group. *Internal EU
E N D
Meeting of Water Directors 30 Nov/1 Dec 2006 Item 4.1 Progress on Reporting and WISE
Contents • Progress and next steps • on compliance – 2010 reporting • on WISE (incl 2008 tools) • on GIS • new mandate
WG D Organisation WISE Steering Group* WISE Technical Group *Internal EU coordination only Preparation/Coordination level Working Group D Reporting Supporting expert networks or drafting teams Compliance State-of-the- environment (SoE) GIS/IT
WG D – progress - compliance • Preparation of 2010 RBMP reporting guidance well underway • Article 3 and 5 assessments (nearly) completed • Feedback on Art 3 started – validation process by consultant nearly completed • Article 8 electronic submission tools developed and tested (see WISE)
2010 reporting guidance – overall time planning Part A 2004 guidance 2005 reporting sheets Part B.1 2005 reporting sheets (2010 data definitions) Part B.2 2007 reporting sheets Part C 2010 reporting sheets (RBMP+PoM) Part D 2010 reporting sheets (objectives and results) Part E • July – Dec 2006: • Oct 06 – March 2007: • April – June 2007: • Presentation of complete draft guidance to Water Directors in June 2007
2010 RBMP reporting – key issues • Informal status of WISE reporting process • Conceptual discussions on “compliance approach” and “programme of measures” illustration • Aggregated or disaggregated “status maps” (similar to Article 5 reporting) • Link between compliance and SoE data needs
Article 3 Re-submission • 9 Member States – data re-submitted, all OK, ready to be uploaded to database • 4 Member States – data re-submitted, some work required to “tweak” data • 3 Member States – correct contact obtained to be progressed by end of today • 9 Member States – have been contacted by e-mail, no response, contact details being validated • Aim to have all contacts made by end of November
Article 5 Submissions • 11 Member States have submitted all components required • 10 Member States have submitted some components • 4 Member States (and Norway) have submitted nothing • Upload of submitted data to database is almost complete
WISE – progress • WISE guidelines under preparation • Electronic submission foreseen for Art 8 reporting • IT tools for Art 8 currently being tested – available in Jan 2007 • WISE workshop in 9/10 Jan 2007 • WISE technical group operational • Preparation of new WISE GIS guidance complementing 2002 document
Data definition/ requirements Step 1: Compliance or SoE, voluntary (or through comitology) IT tools development Step 2: End-user tool, schema/DEM, XML/shape/GML, other tools (DD, glossary), Submission Step 3: Submission process by data holders, help desk Development Database Step 4: central holding area (CDR), management of access rights Acceptance Step 5: Standardised manual or automatic tests, feedback to data submitters Production Databases(WISE nodes) Step 6: Final data storage Viewing, GIS visualisation Analysis Step 7b: Tools for compliance or SoE assessment, CCM2 Step 7a: Public or restricted viewing, map service, aggregation, statistics, GIS reference dataset
WISE – next steps • Submission well completed and reviewed • Establishment of WISE Technical Group led by EEA • Work on WISE Implementation Plan has started • Art. 8 data submission only through WISE – development of rules and procedures document needed • WISE public portal under development – several components
P1.1 P2.1 P1.2 P1.0 P2.2 P2.4 P2.3 water.europa.eu Welcome [Eurokeys] Projects How to use…[RTD/JRC] Input services EEA Data How to use…[EEA] Policy [ENV] Services Overview [Eurokeys] Themes [EEA] P1.1.3 P1.1.5 P1.1.8 P1.1.2 P1.1.4 P1.1.1 P1.1.6 P1.1.7 P1.1.10 P1.1.9 Sitemap FAQ What to find… Contact News Maps Message Board Index/search Links Disclaimer Concept for WISE web portal (Status: 22/11/2006) Are you looking for information on WATER - …? Thematic web pages Thematic web pages WISE GIS Portal WISERTD Portal Extra- Services [EEA] EEA web page LIFE web page ESTAT web page RTD/JRC web page Water Data Centre
Next steps • Validation of Art 3 and Art 5 data in WISE until Jan 2007 • New electronic submission system for Art 8 reporting ready for submission in Jan 2007 – presentation on workshop • 2010 Reporting Guidance – final draft presented to SCG in May 2007 • WISE TG stating to work on GIS guidance – interaction with GIS experts • SoE group to finalise work on task 3 ...
Discussion • Water Directors are invited: • Take note and discuss the progress on all activities • Discuss and agree the interim mandate (see later agenda item)