Project Objective. Operate a business that contributes solutions against Global Warming. (Green E conomy). This will be done through: Production of biofuel (ethanol) Electricity co-generation Waste management Rural Development. Areas of Operation - Municipalities. Alfred Nzo District

peers
Download Presentation

Project Objective

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Objective • Operate a business that contributes solutions against Global Warming. (Green Economy). • This will be done through: • Production of biofuel (ethanol) • Electricity co-generation • Waste management • Rural Development

  2. Areas of Operation - Municipalities • Alfred Nzo District • Mbizana Local • Ugu District • uMuziwabantu Local

  3. Critical licences for the project • BioEthanol Manufacturing licence • Independent Power Producing licence • Water Use licence

  4. Total land needed for the Project • 35 000 hectares – Communal Agricultural land, starting at Mbizana & uMuziwabantu Municipalities • 50 hectares – Factory siteuMuziwabantu Municipality

  5. Stakeholders 1. Municipalities ANDM, Mbizana, Ugu DM, uMuziwabantu 2. eThala Management Services 3. LIMA Rural Development Foundation 4. Alfred Nzo Development Agency 5. HDI Farming Communities

  6. Project Phases Phase 1 –> 10 000 haConstruction of the factory Phase 2 –> 10 000haRamp up Phase 3 –> 15 000ha Optimum Phase

  7. Feasibility Study 1. Environmental Impact Analysis (INR) 2. Acquisition of the cultivar 3. Field Trials of the cultivar 4. Application for licences 5. Access to land

  8. eThala Green Energy Factory Technology Partner: Praj Industries * Receiving and storage of feedstock * Juicing -> Fermentation -> Distilling Units * Power Unit (Steam and Electricity) * Laboratories; Offices; Storage Tankscont.

  9. Statistics Farming land : 35 000ha Jobs : 13 000 Investment :Agricultural : R500mFactory : R2bn Fuel Output : 520 000 lpd Electricity : 425 000 MWh

  10. eThala Management Services Thanks thee