1 / 21

Bill of Materials

Bill of Materials. Contents. Definition of a bill of materials How a bill of materials is used Types of bill of materials Bill of materials information Benefits of a bill of materials Examples of bill of materials. Definition.

pellegrini
Download Presentation

Bill of Materials

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bill of Materials

  2. Contents • Definition of a bill of materials • How a bill of materials is used • Types of bill of materials • Bill of materials information • Benefits of a bill of materials • Examples of bill of materials

  3. Definition • Bill of materials (BOM): a listing of all of the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product. • Each finished product has its own bill of materials. • Product structure tree: Visual depiction of the requirements in a bill of materials, where all components are listed by levels. Bozarth, Cecil C. and Handfield, Robert B. Introduction to Operations and Supply Chain Management . Pearson Education, Inc., Upper Saddle River, New Jersey, 2006. p.461.

  4. Definition Explained • Basically, a bill of material (BOM) is a complete list of the components making up an object or assembly. • It is also part of material requirements planning (MRP) input.

  5. Processes that utilize a BOM • Production • Materials planning • Product costing • Plant maintenance

  6. Types of BOMs • Static (fixed) bill • A bill of material for a part that is normally made from the same components, labor and raw materials. • Used for standard assemblies, components, and engineer-to-order customer orders. • Example: • A bill of materials for a standard chair

  7. Types of BOMs • Dynamic (parametric) bill • A bill of material for a product or part for which size, color, laminate, and other options can be selected. • Example: • A bill of materials for a Dell computer

  8. Structure of a BOM

  9. What information is on a BOM? • Quantity • Item ID# • Description of Item • Cost of Item • Total Project Cost

  10. Quantity • Tells user how many of each part is needed for each project • Example: • A chair needs 1 seat, 4 legs, 1 back, and 5 nails.

  11. Item ID # • Tells us which part to order • Can be any of the following: • Catalog number, UPC, or any other identification number. • Example: • The chair needs a 2PC seat, 5DR legs, 6TU8 back, and 1 inch nails.

  12. Description of Item • Provides a check that the correct item is being ordered.

  13. Cost of Item • Cost is included to show how much each part is per item and the total cost of all like parts. • Example: • The cost of a leg is $5 per leg. Then the total price of the legs ordered would be $20 because there are 4 legs.

  14. Total Project Cost • Shows the total cost of all items and is also the total cost of the direct materials used in the project. • Example: • Seat-$10, Back-$5, Leg-$5 per leg, Nail-$.5 per nail • Total Cost of a chair = 10 + 5 + 5*4 + .5*5 = $37.50

  15. BOM Example Quantity ID# Description Unit Price Total Cost 1 6TU8 Back $5/Unit $ 5.00 4 5DR Legs $5/Unit 20.00 1 2PC Seat $10/Unit 10.00 5 1” Nails $0.50/Unit 2.50 Total Project Cost $37.50

  16. Assembly Diagram & Product Structure Tree

  17. Example

  18. Example 1 (Cont.) • Using the information above to do the follows: a) Determine the quantities of B, C, D, E, and F needed to assemble one X.

  19. X B(2) C D(3) E E(2) F(2) E(4) Solution to Example 1 a). • Thus, one X will require • B: 2 C: 1 • D:6 F: 2 • E: 28 (Note that E occurs in three places, with 2+2+24)

  20. Component B C D E On hand 4 10 8 60 Example 1 (Cont.) • Using the information above to do the follows: a) Determine the quantities of B, C, D, E, and F needed to assemble one X. b) Determine the quantities of B, C, D, E, and F needed to assemble ten X's, if you have the following in inventory:

  21. Component B C D E On hand 4 10 8 60 X B(2) C D(3) E E(2) F(2) E(4) Solution to Example 1 (Cont.) b). • Thus, given the amounts of on-hand inventory, 10 Xs will require • B: 16 C: 0 • D: 40 F: 0 • E: 116 (=16+100)

More Related