70 likes | 372 Views
ASTM F1166 and F1337 Revisions. Christopher Parker Larry Avery 14 November 2007. ASTM F1166: HFE Standard for Ship Design. Revision Purpose: ASTM F1166 is the primary resource for HFE in ship design Originally drafted in 1988 and had not received a significant update in content.
E N D
ASTM F1166 and F1337 Revisions Christopher Parker Larry Avery 14 November 2007
ASTM F1166: HFE Standard for Ship Design • Revision Purpose: • ASTM F1166 is the primary resource for HFE in ship design • Originally drafted in 1988 and had not received a significant update in content. • Revision Goals: • Update and improve the technical content • Better address current trends and issues • Incorporate international populations in design • Improve formatting for ease of use
ASTM F1166: HFE Standard for Ship Design • Status/Events: • ASTM F1166 - 2007 was approved by F25 in December 2006 • Published in May 2007 • ASTM/SNAME Sponsored Seminar on HFE/ASTM F1166 – 2007 in May 2007 • Standard is available via www.ASTM.org in two versions: • Traditional ASTM Format • More user friendly “Information Mapping” format • Starting to be utilized in contracts • Provided basis for Shell Oil revised HFE standards
ASTM F1337: Standard for HFE Program Requirements for Ships • Goals • Update content based on current practice and lessons • Incorporate HSI (not just HFE) • Respond to comments on interim draft • Challenges • Articulating how “integration” part of HSI happens • Determining appropriate level of detail • Ensuring that document adequately addresses two very different constituencies – Navy/Gov’t and Commercial
ASTM F1337: Standard for HFE Program Requirements for Ships • Process • Research domains of HSI, system life cycle processes for Navy and commercial shipping • Develop second draft for review by select Navy and Commercial SMEs • Develop final draft for submission to ASTM for review and approval • Address issues from ASTM review and submit final standard to ASTM for formatting and publication • Status • Currently performing research phase • Second draft by end of year • Final draft by February 2008 • Final by April 2008
More information: • ASTM F1166: • Chris Parker • cparker@dandp.com • 202.277.8444 • ASTM F1337: • Larry Avery • lavery@dandp.com • 919.713.0383