Renewable Proposals Made at October Board. Proposal 1. Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate with other analyses (e.g., WestConnect/NREL solar and wind integration study) Example analyses: Major growth in renewable generation
E N D
Proposal 1 • Identify analyses needed to inform policy debates • Coordinate WECC-wide info/analysis and coordinate with other analyses (e.g., WestConnect/NREL solar and wind integration study) • Example analyses: Major growth in renewable generation • National RPS and/or robust Western RECs trading system • Technology breakthroughs (PVs, CCS) • Electrification of the transportation sector • Climate change impacts on load and hydro generation • Other • Who: Variable Generation Subcommittee • Recent Activity: • Technical Session at December Board • Kickoff Meeting January 15 • Draft work plan
Proposal 2 • Assessment of transmission needs: • Continue to build analysis capacity (historical schedules/flows, modeling of capital and operating costs for transmission solutions) • Evaluate robustness of transmission solutions beyond 10 years (scenario analysis beyond 10 years) • Who: TEPPC • Recent Activity: • 2009 Study Plan in progress. Likely to include capitol costs and time horizon longer than 10 years • Task Force to respond to Stimulus Bill
Proposal 3 • Forum for LSE and PUC resource planners • Establish in conjunction with others (CREPC, WGA, CEOs) a forum to promote information sharing among LSE resource planners and PUCs/energy agencies • Forum would share information on topics such as methods for evaluating carbon risk in resource decisions, low carbon technology assumptions • Forum would respond to requests (e.g., LSE long-term renewable generation plans) • Who: WGA • Recent Activities: • Planning Forum held February 24-25
Proposal 4 • Evaluate the long-term adequate sizing of new transmission to location-constrained low carbon resources • Who: TEPPC • Recent Activities • Long-term transmission planning forum February 2-3 • WGA request for “transmission superhighway overlay” for 2009 study plan being considered
Proposal 5 • Undertake timely analysis of the reliability implications of innovations to reduce cost of integrating renewables, such as: • ACE Diversity Initiative • Regulation sharing • Virtual control area consolidation • Who: Variable Generation Subcommittee • Recent Activity: • Technical Session at December Board • Kickoff Meeting January 15 • Draft work plan
Proposal 6 • Consider additional tests for approving new Balancing Authorities such as: • Will the creation of a new BA lower the cost of integrating more renewables? • Will a new BA improve reliability? • Who: WECC Staff (complete) • Recent Activities • Staff presented whitepaper during December Board