1 / 22

Multivariable Control Systems ECSE 6460

Multivariable Control Systems ECSE 6460. Fall 2009 Lecture 27: 8 December 2009. Uncertain MIMO Plant. G p (s). Frequency Response. Feedback Control Loop. K(s). G p (s). +. -. practically zero steady state error for step reference rise time less than 1 second overshoot less than 5%

Download Presentation

Multivariable Control Systems ECSE 6460

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Multivariable Control SystemsECSE 6460 Fall 2009 Lecture 27: 8 December 2009

  2. Uncertain MIMO Plant Gp(s)

  3. Frequency Response

  4. Feedback Control Loop K(s) Gp(s) + - • practically zero steady state error for step reference • rise time less than 1 second • overshoot less than 5% • robustly for any value of c

  5. From previous lecture • Representing the uncertainty • a la unstructured uncertainty • a la structured uncertainty • Assessment of robust stability • a la unstructured uncertainty • a la structured uncertainty • Assessment of robust performance • a la unstructured uncertainty • a la structured uncertainty

  6. Today’s class • How to design a controller that minimizes the structured singular value. • This is a sub-optimal solution, but works well in practice. • The technique is called DK iteration (see dksyn function in MATLAB).

  7. Robust Performance Assessment Unstructured Uncertainty Wo(s) + + K(s) G(s) WP(s) + + -

  8. Robust Performance Assessment Structured Uncertainty Ws(s) + + K(s) G(s) WP(s) + + -

  9. Robust Performance Assessment DP D N

  10. Robust Performance Assessment D 0 0 DP N

  11. N as a ‘function’ of K P K Note that, from previous classes, we know how to design K so as to minimize the H-infinity norm of N.

  12. Robust Performance Assessment D N D -1 In DK iteration, the K step consists of solving H infinity synthesis for weighted N.

  13. New plant model with weights D D -1 P K The new plant model can be formed by including the weights.

  14. Unstructured Uncertainty

  15. Robust Performance Assessment Unstructured Uncertainty Wo(s) + + G(s) WP(s) + + -

  16. First iteration See unstruct_ex.m

  17. Second iteration See unstruct_ex.m

  18. Structured Uncertainty

  19. Robust Performance Assessment Structured Uncertainty Ws(s) + + G(s) WP(s) + + -

  20. First iteration See struct_ex.m

  21. Second iteration See struct_ex.m

  22. Third iteration See struct_ex.m

More Related