1 / 11

TEAP and TOC 2010 Assessment Reports: Timelines and Issues

This article provides an overview of the timelines and issues that will be addressed in the TEAP and TOC 2010 Assessment Reports. It includes information on the Technology and Economic Assessment Panel (TEAP) and its various TOCs, such as CTOC, FTOC, HTOC, MTOC, MBTOC, and RTOC. The timelines and processes involved in the creation of these assessment reports are also discussed.

phagerman
Download Presentation

TEAP and TOC 2010 Assessment Reports: Timelines and Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt with T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  2. TEAP and its TOCs • Technology and Economic Assessment Panel • CTOC: Chemicals TOC • FTOC: Foams TOC • HTOC: Halons TOC • MTOC: Medical TOC • MBTOC: Methyl bromide TOC • RTOC: Refrigeration, AC and Heat Pumps TOC T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  3. 2010 TEAP and TOC Assessment Reports • Timeline of Work: (2008)-2009: • Definition of scope and content of the reports • Designation of chapter lead authors for specific chapters and sections, as well as the entire authorship • Initial determination of reports structure and layout (TOC meeting) • Identification of areas needing particular work - development of task-list • TOC meetings to discuss items and decide on first draft • First draft of reports (when dependent on specific TOC) and discussions T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  4. 2010 TEAP and TOC Assessment Reports • Timeline of Work: 2010: • Further compilation and update of necessary information • Report drafting (new drafts) • TOC meetings or CLA-TOC meetings to discuss drafts • Preparation of review drafts (and possible external review) • Final discussion of comments and review comments (TOC meetings) • Finalisation of TEAP report • Submission of reports by 31 December 2010 T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  5. CTOC 2010 Assessment Report • Process Agents (as a follow up to XVII/6) • Laboratory and Analytical Uses • nPB; Overview of updates (in response to Decision XIII/7) • Feedstocks and emissions from feedstocks • Reconciling bottom-up CTC emissions versus emissions derived from atmospheric measurements • Use of solvents and non-medical aerosol propellant applications • Update on destruction technologies T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  6. FTOC 2010 Assessment Report • Report on transition to zero ODP options in Article 5 and non-Article 5 Parties • Review status of proven in-kind technologies (HCs, HFCs) to replace HCFCs in foam and comparison with not-in-kind options • Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP) • Validation of emerging in-kind HCFC replacement technologies as potential alternatives tohigh GWP HFCs and hydrocarbons (HCs) including: methyl formate, HFC(HFO)-1234ze, other liquid HFCs (HFOs) • Evaluation of pilot projects to assess the emerging technologies • Update size of banks and emissions of different ODP GHG blowing agents • Progress in bank management efforts T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  7. HTOC 2010 Assessment Report • Update of halon supply and demand particularly with respect to airlines and Article 5 Parties • Assessment of the environmental and fire protection implications of over/ or under supply of halons and functionality of banking mechanisms to supply halons to ongoing critical needs T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  8. MTOC 2010 Assessment Report • MDIs • Review of available technology • Global status of the MDI transition • Progress of transition in Article 5 Parties • Production of pharmaceutical-grade CFCs • Remaining challenges for phase-out of CFC MDIs • Sterilants • Review of available technology • Global status of the sterilant transition • Global use of HCFCs • Remaining issues for the phase-out of ODS in sterilisation T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  9. MBTOC 2010 Assessment Report • A listing of alternatives successfully adopted in non A5 and A5 Parties for all uses, with particular emphasis on remaining critical uses • Technical, economic and regulatory constraints to the adoption of alternatives to MB for remaining uses (non A5 and A5) • The contribution of MB phase-out to ozone layer protection, human health, sustainable development and the impact of alternatives on climate change, particularly in A5 Parties • An update on the technical and economic feasibility of emission reduction, recovery, reuse and destruction of MB • An analysis of QPS uses • Case studies on adoption of alternatives T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  10. RTOC 2010 Assessment Report • Report on transition to zero ODP options in Article 5 and non-Article 5 Parties • Review status of replacement technologies (HCs, HFCs, CO2, others) for HCFCs in the refrigeration and AC sub-sectors, specifically commercial and large size refrigeration, unitary AC and chillers • Review status and developments in sub-sectors which have already transitioned to non ODS solutions • Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP) • Update size of banks and emissions of different refrigerants in the different refrigeration and AC subsectors T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

  11. TEAP 2010 Assessment Report The TEAP 2010 Assessment report will consist of: • An executive summary of the executive summaries of all TOC assessment reports (and will contain all executive summaries of the TOC reports) • Specific assessment of new developments and issues important for the 2010 Synthesis with the SAP and EEAP Assessment Reports T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a

More Related