1 / 19

Chaire CTSC

Overview of the 2 nd Carbon Capture and Storage Conference Berlin, 19-20 May, 2010. Chaire CTSC. David SOUSA, Denis CLODIC. 1 er décembre, 2010. The 2 nd CCS conference. Attended by 60 delegates Main topics: EU and member state policies CCS projects Capture Transport Storage

pippa
Download Presentation

Chaire CTSC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of the 2nd Carbon Capture and Storage Conference Berlin, 19-20 May, 2010 Chaire CTSC David SOUSA, Denis CLODIC 1er décembre, 2010

  2. The 2nd CCS conference • Attended by 60 delegates • Main topics: • EU and member state policies • CCS projects • Capture • Transport • Storage • Public perception 2 2nd Carbon Capture and Storage Conference

  3. The 2nd CCS conference • Attended by 60 delegates • Main topics: • EU and member state policies • CCS projects • Capture • Transport • Storage • Public perception 3 2nd Carbon Capture and Storage Conference

  4. 4 2nd Carbon Capture and Storage Conference

  5. EU-ETS-NER300 • 300 M€ until December 2015 • Commercial demonstration projects (8 CCS, 34 RES) • Geographical balance: Min 1, Max 3 projects per Member State • Financing up to 50% of relevant costs. The remaining costs by public or/and private supports • 1st Call (200 M€) • 31 Dec 2010 – Deadline for submissions • 31 Dec 2011 – Deadline for Award decision • 2nd Call (100 M€) – Award Decision on Dec 2013 5 2nd Carbon Capture and Storage Conference

  6. EU-ETS-NER300 • CCS projects: • Between 1 and 3 projects (Pre/Post-combustion, Oxy-fuel, and industrial applications) • Min size threshold: 250 MW • Min capture efficiency: 85% • All CO2 emissions sources (energy, steel, cement, …) • Payment: Yearly basis during operation and as a function of the CO2 stored • Financial penalty if 75% of projected CO2 stores is not achieved 6 2nd Carbon Capture and Storage Conference

  7. 7 2nd Carbon Capture and Storage Conference

  8. Status of CCS in Germany 8 2nd Carbon Capture and Storage Conference

  9. Status of CCS in Germany • 1st Round • Federal German draft CCS-Law as of April 1st, 2009 • GOAL: Stimulate a successful demonstration phase • The draft law integrated all CCS stages: capture, transport, exploration of storage sites, injection, and decommissioning • July 2009 – Parliament postpones CCS Legislation • 2nd Round • March 2010: process re-started • Finalization of CCS legislation by the end of 2010 9 2nd Carbon Capture and Storage Conference

  10. Status of CCS in Germany 10 2nd Carbon Capture and Storage Conference

  11. Status of CCS in Germany Manifestation against CO2 storage in front of the Intercontinental Berlin Hotel – 20 May 2010 2nd Carbon Capture and Storage Conference

  12. Presented by Mikko Iso-Tryykary - FINNCAP 12 2nd Carbon Capture and Storage Conference

  13. FINNCAP – Meri-Pori CCS project Strong position in Nordic countries and Russia 13 2nd Carbon Capture and Storage Conference

  14. FINNCAP – Meri-Pori CCS project 14 2nd Carbon Capture and Storage Conference

  15. FINNCAP – Meri-Pori CCS project 15 2nd Carbon Capture and Storage Conference

  16. 16 2nd Carbon Capture and Storage Conference

  17. CCS Projects at Petrobras 17 2nd Carbon Capture and Storage Conference

  18. CCS Projects at Petrobras 18 2nd Carbon Capture and Storage Conference

  19. CCS Projects at Petrobras 19 2nd Carbon Capture and Storage Conference

More Related