130 likes | 315 Views
Mission Assurance Preliminary Design Review. Ron Jackson and Jorg Fischer University of California – Berkeley (510) 643-2625 rjackson@ssl.berkeley.edu (510)642-3942 jorg@ssl.berkeley.edu. 85. Safety and Mission Assurance Management. Backup Documents.
E N D
Mission AssurancePreliminary Design Review Ron Jackson and Jorg Fischer University of California – Berkeley (510) 643-2625 rjackson@ssl.berkeley.edu (510)642-3942 jorg@ssl.berkeley.edu 85 EFW INST+SOC PDR
Safety and Mission Assurance Management • Backup Documents • EFW UCB Matrix 7417-9096_EFW_UCB_Matrix_071508 • Configuration Control (7417-9006 CM Plan) • Problem Failure Report (SSL_QAP_003_rev-) • Parts Identification List PA_003c_parts_PDR.pdf • Materials Identification List Materials and Processes List • Approved Suppliers List AVL_071708-1_top.xls EFW INST+SOC PDR 86
EFW UCB Matrix EFW INST+SOC PDR 87
EFW UCB Matrix EFW INST+SOC PDR 88
EFW UCB Matrix EFW INST+SOC PDR 89
Matrix Action Items EFW INST+SOC PDR 90
Configuration Management EFW INST+SOC PDR 91
PFR EFW INST+SOC PDR 92
Parts List EFW INST+SOC PDR 93
Materials and Processes List EFW INST+SOC PDR 94
Materials and Processes List EFW INST+SOC PDR 95
Approved Supplier List EFW INST+SOC PDR 96