130 likes | 274 Views
Mission Assurance Preliminary Design Review. Ron Jackson and Jorg Fischer University of California – Berkeley (510) 643-2625 rjackson@ssl.berkeley.edu (510)642-3942 jorg@ssl.berkeley.edu. Safety and Mission Assurance Management. EFW UCB Matrix Parts Identification List
E N D
Mission AssurancePreliminary Design Review Ron Jackson and Jorg Fischer University of California – Berkeley (510) 643-2625 rjackson@ssl.berkeley.edu (510)642-3942 jorg@ssl.berkeley.edu Mission Assurance PDR
Safety and Mission Assurance Management • EFW UCB Matrix • Parts Identification List • Materials Identification List • Approved Suppliers List • Problem Failure Report • Configuration Control Mission Assurance PDR
EFW UCB Matrix Mission Assurance PDR
EFW UCB Matrix Mission Assurance PDR
EFW UCB Matrix Mission Assurance PDR
Matrix Action Items • Added after Telecom Mission Assurance PDR
Parts List Mission Assurance PDR
Materials and Processes List Mission Assurance PDR
Materials and Processes List Mission Assurance PDR
Approved Supplier List Mission Assurance PDR
PFR Mission Assurance PDR
Configuration Management Mission Assurance PDR
Backup Documents • EFW UCB Matrix 7417-9096_EFW_UCB_Matrix_071508.xls • Parts List PA_003c_parts_PDR.pdf • Materials List Materials and Processes List_Turin.doc • Approved Vendors List AVL_071708-1_top.xls Mission Assurance PDR