1 / 4

Storm Water Planning Storm Drainage Design Storm Water Management—Quantity

Semester 2: Land Development Engineering LDE 201-213 . September 7 September 14 September 21 September 28 October 5 October 12 October 19 October 26 November 2 November 9 November 16 November 23 November 30. Storm Water Planning Storm Drainage Design

plato-olsen
Download Presentation

Storm Water Planning Storm Drainage Design Storm Water Management—Quantity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Semester 2: Land Development Engineering LDE 201-213 September 7 September 14 September 21 September 28 October 5 October 12 October 19 October 26 November 2 November 9 November 16 November 23 November 30 Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater Treatment Utilities—Water Distribution Utilities--Dry Utilities Erosion & Sediment Control The Site Design Process: Steps & Proc. The Site Design Process: Steps &Proc. Document Production—What & How Engineer’s/Surveyor’s Roles During Construction Final Exam

  2. Land Development Engineering LDE 300 Administrative Requirements for Plan Submission & Site Completion (ARPSSC) Fairfax County Sequence LDE 310 January 2011 TBD Comprehensive Plan Rezoning Zoning Players/Functions Site & Subdivision Plans Other Plans/ DPE/Peer Review

  3. Land Development Engineering LDE 320 Loudoun County Sequence Dates TBD Welcome To Loudoun County Legislative Process Subdivision Process Site & Construction Plan Process Bonding Process

  4. Land Development Engineering LDE 330 Prince William County Sequence DATE TO BE DETERMINED Comprehensive Plan 9:00 -10:30 AM Rezoning 10:30 AM - 12 Noon Zoning 1:00 - 2:30 PM Site & Subdivision Plan 2:30 - 4:00 PM Legal Aspects 4:00 - 5:30 PM

More Related