1 / 7

Level 1 Muon Trigger Status and Commissioning

Level 1 Muon Trigger Status and Commissioning. Rob McCroskey University of Arizona for the L1 Muon Group. Cabling. L1muo trigger crates (north, central, south) are ~85% complete L1muo splitter crates (CFT, north, south) ~30% done - goal to finish by end of shutdown

porter
Download Presentation

Level 1 Muon Trigger Status and Commissioning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Level 1 Muon Trigger Status and Commissioning Rob McCroskey University of Arizona for the L1 Muon Group

  2. Cabling • L1muo trigger crates (north, central, south) are ~85% complete • L1muo splitter crates (CFT, north, south) ~30% done - goal to finish by end of shutdown • L1muo centroid crates (2 north, 2 south) - FE cables run, not hooked up • In process of finding/fixing bad cables

  3. Infastructure • All production power supplies installed and tested • Big thanks to Carl Lundberg for taking this project A-Z • Control/monitoring GUI supplied by Manas Maity • All rack prep done - Ed Arko & Co. • Final PORC passed!! • Firmware written for next month of running - Mikhail Baturitskiy

  4. Installed Hardware • All crate managers - cental, north, south, and manager • Trigger cards • CF • Five octants (0-4) CFT+Scint cards (05) • Five octants (0-4) PDT+Scint cards (10) • EFN, EFS • Two octants (0-1) CFT+Scint cards • Hope to add 1-2 more octants of 05 cards by next week • Centroid finding cards (MCEN) • EFN (A-layer) • One manager card • Four centroid cards

  5. Triggers • Can trigger off Aphi, CMSC coincidences in CF and A, B pixel coincidences currently • Trigger is currently simple layer coicidence - no roads • Plan on putting in pixel roads soon • Working on PDT triggers currently - will start with simple ‘deck’ trigger (e.g., 4/4 decks hit in A-layer) • MDT triggers questionable - work on getting MCEN cards running next week and sending centroids to L1muo trigger cards for A-layer north

  6. Trigger List 1. A.C scint coincidence central 2. A.C PDT coincidence central 3. A.B scint coincidence north 4. A.B scint coincidence south 5. A.C scint coincidence C+N+S 6. A.C scint and PDT coincidence 7. Central dimuon (coincidence in two central octants) 8. Anywhere dimuon (coincidence in any two octants) d0server4:\\users\johns\xls\ mtm-terms-may-june.xls

  7. July 1 • Assuming some short accesses, we plan on installing more scintillator cards (05) in both CF and EF • Hardware is on hand, awaiting testing/debugging • Everything in place for ‘plug and play’ operation • Wire boards (10) will require work - first batch (10/28) have some soldering problems on BGA’s • Improved scint. coincidence logic in both CF and EF

More Related