Perform Integrated Change Control (4.5 Ref PMBOK 4 th Edition)

Perform Integrated Change Control (4.5 Ref PMBOK 4 th Edition). Perform Integrated Change Control. Inputs Project Management Plan Work Performance Information Change Requests ??? ???. Tools & Techniques Expert Judgment Change Control Meetings. Outputs Change Request Status Updates

prentice
Download Presentation

Perform Integrated Change Control (4.5 Ref PMBOK 4 th Edition)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Perform Integrated Change Control (4.5 Ref PMBOK 4th Edition)

  2. Perform Integrated Change Control Inputs Project Management Plan Work Performance Information Change Requests ??? ??? Tools & Techniques Expert Judgment Change Control Meetings Outputs Change Request Status Updates Project Management Plan Updates Project Document Updates

  3. Change Control • Change control is not an easy task • Integrate change control must cater for factors like: • Triple Constraint (time, scope, cost) • Risks • Quality • Employee Morale • Stakeholders’ satisfaction • Etc.

  4. Change Control Board • Approves, defers, or rejects change requests • Typical members: • Project Manager (leads the board) ??? • Project team members • Customer Representatives • Configuration Manager (serves as secretary)

  5. Prerequisite for Change Control • Proper Requirements Management • Document and classify requirements changes • Determine if the change is within scope • Analyze the change for impact • Submit the change for approval • Allocate & trace approved requirements • Configuration Management Processes • Identify and document characteristics • Control changes to characteristics • Record and report changes & their implementation status • Audit items

  6. Configuration Management Activities • Configuration Identification • Selection and identification of a configuration item • Configuration status accounting • Information is recorded and reported as to when appropriate data about the configuration item should be provided • This information includes a listing of approved configuration identification, status of proposed changes to the configuration, and the implementation status of approved changes • Configuration verification and audit • It ensures that the composition of a project’s configuration items is correct and that corresponding changes are registered, assessed, approved, tracked, and correctly implemented • This ensures the functional requirements defined in the configuration documentation have been met.

  7. Guess What???