An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Defense Acquisition Guidebook Systems Engineering Chapter Update Ms. Aileen Sedmak Office of the Deputy Assistant Secretary of Defensefor Systems Engineering 15th Annual NDIA Systems Engineering ConferenceSan Diego, CA | October 24, 2012

  2. Defense Acquisition Guidebook (DAG) Chapter 4 Revision – A Phased Process Phase 1 Fact-of-Life: Completed • Made minimum chapter revisions necessary to align with approved policy/business practice • Coordinated with other chapter editors • Established no new policy • Released October 2012 Phase 2 Update and Restructure: On-going • Base on other approved policy/business practice • Re-examine and revise Chapter 4 contents, structure, message

  3. DAG Chapter 4 Phase 1 Update

  4. DAG Chapter 4 Revision Phase 1: “Fact of Life” Update • Made minimum chapter revisions necessary to align with approved policy and business practices • Coordinated with other DAG chapter editors • Established no new policy Published in October 2012

  5. Key Policy Changes with SE Impact • Statute changes since Weapon Systems Acquisition Reform Act (WSARA): • Section 812, Manufacturing • Section 805, Government Performance of Critical Acquisition Functions • USD (AT&L) Memoranda • WSARA Implementation Directive-Type Memorandum • Better Buying Power Memos • Should Cost/Will Cost Memos • Improving Milestone Process Effectiveness Memo • Improving Technology Readiness Assessments Memo • Post-CDR Review Reports and Assessments Memo • Development Planning Directive Type Memorandum • Reliability Directive-Type Memorandum • Acquisition Streamlining Memos • Revisions to the Acquisition Strategy/Technology Development Strategy/Systems Engineering Plan/Program Protection Plan/Lifecycle Sustainment Plan Outlines • DoDI 5134.16, DASD(SE) Authorities and Responsibilities Ensured consistency with other guidance changes in other areas

  6. DAG Chapter 4 Phase 2 Update

  7. DAG Chapter 4 Phase 2: Rewrite • Add guidance for new policy and DASD(SE) initiatives • Improve currency, consistency, usability, and readability • Focus the content on “Systems Engineering provides a balanced approach (cost, schedule, risk) for delivering needed capability to the war fighter”

  8. Policy and DASD(SE) Initiatives • Joint Capabilities Integration and Development System (JCIDS) (Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 3170.01H) • Overarching DoD Counterfeit Prevention Guidance • Systemic Root Cause Analyses Findings • Systems Engineering Standards Development for Systems Engineering, Technical Reviews & Audits, and Configuration Management

  9. New CJCSI 3170.01H Requirements Reference: CJCSI 3170.01H, Enclosure A, 10 January 2012 “(b) Following an AoA on capability requirements in a JROC or JCB Interest ICD, the appropriate FCBs review the AoA and recommended solution, and other (MSA) analyses. Together with the solution sponsor, the FCB Chair briefs the JCB and/or JROC on the AoA recommendations and FCB assessment to facilitate the JCB or JROC providing informed advice to the MDA on the best approach to satisfy the capability requirement(s).” “(c) The FCB review of these MSA results shall be completed in sufficient time to permit preparation of a draft CDD, not submitted to JCIDS for validation at this time, to inform the Technology Development Strategy and Request for Proposals for the TD phase. CDD = Capabilities Development Document CPD = Capabilities Production Document FCB = Functional Capability Board ICD = Initial Capabilities Document JCB = Joint Capability Board JROC = Joint Requirements Oversight Council SAG = Senior Advisory Group • New Draft CDD ICD (JROC) CDD (JROC) • New A B MDD FCB Analysis of Alternatives (AoA) Technology Development (TD) Phase Materiel Solution Analysis (MSA) Phase Programmatic & Technical Analysis Materiel Development Decision Final AoA SAG Preferred Materiel Solution Contract $$ PDR

  10. New CJCSI 3170.01H Requirements • Emphasize Milestone A is a critically important synchronization point between the Requirements and the Acquisition Communities • Contract(s) for creating preliminary design awarded based on Milestone A Request For Proposal • Preliminary design based on the system specification that is derived from draft CDD and other analysis • Joint Staff advice for the Milestone Decision Authority (MDA) considers both AoA results and other MSA analyses Reference: DoDI 5134.16, Enclosure 2, 19 August 2011 1.h. [DASD(SE) shall] “Provide input on the inclusion of systems engineering requirements in the process for consideration of joint military requirements by the Joint Requirements Oversight Council (JROC), including specific input relating to each capabilities development document.”

  11. USD(AT&L) Memorandum: Overarching Anti-Counterfeit Prevention Guidance • Addresses an area of critical concern while Department policy is in coordination • Provides definition • “an item that is an unauthorized copy or substitute that has been identified, marked, and/or altered by a source other than the item’s legally authorized source and has been misrepresented to be an authorized item of the legally authorized source.” • Emphasizes • Risk-based approach • Leverages Program Protection Plan and non-conforming processes • Directs use of existing contracting clauses and data elements to ensure traceability and reporting on critical items for contractors and subcontractors • Use of anti-counterfeiting standards • Disposal of counterfeit items • Training Adding new section on mitigating the effect of counterfeit parts

  12. Systemic Root Cause Analyses (SRCA) • Using SRCA findings as inputs for DAG Chapter 4 updates • NDIA SRCA Report (December 2008) identified 28 actions grouped into three recommendation areas • Acquisition Strategy and Planning • Decision Gate Review • Enhanced Staff Capability • DASD(SE) FY2011 SRCA identified 52 negative findings associated with 5 of the 6 Defense Acquisition Program Support (DAPS) areas • Many findings align to NDIA SRCA Report (2008) • Findings provide detailed insight into: • SE Processes • Baseline Management • Software • Design Verification • Reliability Assessment • Production Incorporate to improve DAG currency and usability

  13. Standards Development • Defense Standardization Council (DSC) recognized that enterprise-wide approaches were needed for certain systems engineering disciplines • Working groups focused on standards for specific areas: • Systems Engineering • Technical Reviews and Audits • Configuration Management • Logistics Support Analysis • DSC direction to the working groups • Adopt existing voluntary standards, to the greatest extent possible, to leverage industry best practices for DoD • If necessary, supplementexisting voluntary standards withappropriate direction unique to DoDto provide contractually applicable/enforceable language • Develop Military Standards only when all other options have been explored and determined to be unworkable Incorporate in DAG once each activity is complete

  14. Analyzed Current DAG • Determined audience by identifying current and future users • Identified users’ perspectives • Assessed the applicability and usefulness of the content • Recognized strengths and limitations / gaps

  15. Findings From Current DAG Review • Need to update basic framework and account for multiple domain areas • Support different functions and roles, Program Manager and Systems Engineer • Be flexible to support different acquisition models • Take into account others affected (e.g. INCOSE CSEP and DAU) • Should be an SE primer and referencedocument • Provide consistent overarching guidance and top level information, with linkages to relevant policy and detailed guidance • Keep abreast of DoD Instruction 5000.02 update and Standards efforts • Need to improve readability and usability • Improve usefulness to target user (PM and SE) based primarily on content, readability and clarity • Need to reflect relevant, current policy and guidance

  16. DASD(SE) Direction on Phase 2 • Use a product-centered approach, where the product is the weapon system or capability under development • Thread policy, activities/processes, and product together Policy (Direction / Requirement) → Process (How) → Product (What) • Do not restate policy, rather clarify intent of policy and identify expectations • Do not invent guidance to fill a gap in policy and remove preferences • Map to Services’ practices • Minimal links • Include the emerging acquisition models Provide the thinnest layer of guidance to get the job done

  17. New DAGC4 Phase 2 Framework • Introduction (Overview) • Systems Engineering Definition • Why it’s important • Systems Engineering Activities in the Life Cycle • By phase description of key activities • Technical Reviews • Emerging Acquisition Models • Systems Engineering Processes • Description of each Process • Design Considerations • Specialty Engineering • Overarching Themes: • Provide balanced approach in delivering a capability to the war fighter • Support program success through systematically increasing maturity and reducing risk over the acquisition lifecycle

  18. Plan Forward • Revise to update content, usefulness, and readability • Coordinate with Stakeholders (including NDIA) • Review and approve update • Submit to policy office for publishing

  19. Systems Engineering:Critical to Program Success Innovation, Speed, and Agility http://www.acq.osd.mil/se

  20. Additional References

  21. NDIA SRCA Report (December 2008) • The NDIA SRCA Report identified three recommendation areas: • Acquisition Strategy and Planning • Decision Gate Review • Enhanced Staff Capability • Each recommendation area identified several end states with associated actions and implementations • Not all actions or implementations are associated with systems engineering

  22. Defense Acquisition Program Support (DAPS) Methodology • The DAPS methodology is composed of 6 areas • Mission Capabilities • Resources • Management • Technical Process • Performance • Special Interest Areas • Each area has various sub-areas and factors Factor 1 Sub-Area 1 Area Factor 2 Sub-Area 2 Area = A mutually exclusive and distinct category or programmatic activity or focus Sub-Area = A division of the Area into related subject matter components Factor = Condition or fact that actively contributes to an accomplishment, result or process