1 / 11

Rural Levee Repair Criteria

Rural Levee Repair Criteria . Informational Briefing to the Central Valley Flood Protection Board July 12, 2013 David J. W. Wheeldon P.E., Chief Flood System Sustainability Branch Department of Water Resources, Flood Maintenance Office. Resolution No. 2012-25. Section 11 (h).

qamra
Download Presentation

Rural Levee Repair Criteria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rural Levee Repair Criteria Informational Briefing to the Central Valley Flood Protection Board July 12, 2013 David J. W. Wheeldon P.E., Chief Flood System Sustainability Branch Department of Water Resources, Flood Maintenance Office

  2. Resolution No. 2012-25. Section 11 (h)

  3. Diverse Membership

  4. RLRC Framework 1 2 3 4 5

  5. RLRC Schedule and Milestones

  6. RLRC Schedule and Milestones, cont.

  7. KEY CONTACT INFORMATION: • http://www.water.ca.gov/floodmgmt/fmo/rlrc/ • RLRC@water.ca.gov • DWR: David J. W. Wheeldon, P.E. • (916) 574-1243 • Dave.Wheeldon@water.ca.gov • http://www.water.ca.gov/floodmgmt/fmo/rlrc/

  8. Workplan and Timeline, Cont.

  9. Conceptual Model

  10. Repair Alternative Sample Template

  11. Workplan and Timeline

More Related