110 likes | 220 Views
MSIP 5 Update. Board of Education April 21, 2011. Missouri School Improvement Program. Began in the 1980’s Entering fifth cycle (second attempt) Establishes standards by which school districts are evaluated and accredited Guided by Top 10 by 2010 and federal blueprints.
E N D
MSIP 5 Update Board of Education April 21, 2011
Missouri School Improvement Program • Began in the 1980’s • Entering fifth cycle (second attempt) • Establishes standards by which school districts are evaluated and accredited • Guided by Top 10 by 2010 and federal blueprints
MSIP 5 Review Cycle Phase-in 2011-12 • Cycle 4 Standards & Indicators 2012-13 • Cycle 4 Standards & Indicators 2013-14 • Cycle 5 Standards & Indicators
Major Changes • Performance Standards only • Annual Reviews based on data
MSIP 4 Indicators • MAP (6) • Subgroup Achievement • ACT • Advanced Courses • Career Education Courses • Career Education Placement • College Placement • Graduation • Attendance
MSIP 5 IndicatorsMeet or exceed state standards • New assessments (in addition to previous) • Subgroup achievement • ACT/SAT (participation and composite score) • Advanced Placement, International Baccalaureate and/or Technical Skills Attainment • Attendance • Graduation • Percent in college/training or military 6 months after graduation • Percent of graduates enrolled in remedial coursework
Current Mandated Assessments (MSIP 4) • Communication Arts, Grade 3-8 • Mathematics Grades 3-8 • Science Grades 5 and 8 • End of Course Exams: • Algebra 1 • English1 • Biology • American Government
Proposed Additional Assessments • Pre-K through Grade 2** • Social Studies, Grades 3-5 * • Fine Arts, Grades 3-5 * • Physical Education, Grades 3-5 * • Social Studies, Grades 6-9 * • Fine Arts, Grades 6-9 * • Physical Education, Grades 6-9* • Algebra II EOC • Geometry EOC • English I EOC • English III EOC • Physics EOC • Chemistry EOC • World History EOC • American History EOC • Comprehensive End of High School Exam for Communication Arts • Comprehensive End of High School Exam for Mathematics *Grade level to be determined later ** Report only
Concerns • Lack of • Stakeholder input • Detail about state standard • Resource and process standards (HB 1543) • Standards for college remedial coursework • Credit for career placement • Credit for dual enrollment • Required • Additional assessments (costs, time, computers, etc.) • High school courses
Timeline • 4-14 Commissioner recommends withdrawal • 4-15 Public comment period begins • 5-14 Public comment period ends If the commissioner’s recommendations are accepted, MSIP 5 advisory group will meet, seek input and make recommendations between May and August. It is anticipated that revisions will be submitted to the State Board of Education in August.
Public Comment Period • http://dese.mo.gov/qs/MSIP5.html • Address letters to: State Board of Education PO Box 480 Jefferson City, MO 65102 • Email comments to: msip@dese.mo.gov