How Energy Models are Staged • Utilize Building Energy Models • Economic Model • Final Design Model • Evaluation Model Applied at different stages of the project. Turnover & Operation Permitting Programming DDs SDs CDs
Recently Completed “High Performance” Buildings Lokey Stem Cell Research Building • Large Wet Lab Knight Management Center • Multi building office / classroom facility William H. Neukom Building • Simple office building
Lokey Stem Cell Research Building • Medical School lab/research building • Opened in Fall 2010 • 258,000 square feet • 380 VAV fumehoods • Zone level heating and cooling • Heat recovery on main air handler units
LokeyStem Cell Research Building - Analysis • Zone level heating + cooling is very effective • Heat recovery system is more effective than modeled for this 100% outside air AHU system. • The plug load for lab space used in the original load calculation is over estimated by a factor of three.
Knight Management Center • Stanford Graduate School of Business • Completed in 2011 • 387,510 square feet (eight buildings) • Includes: offices, classrooms, conference rooms, library, auditoria, and dining pavilion • LEEDTM Platinum • Extensive submetering
Knight Management Center – Analysis • Design operating hours were greatly exceeded • Could see high nighttime plug and lighting loads thanks to submetering • Utilized temporary occupancy sensors to verify • (Need an industry metric to account for space utilization) • Heating load under-estimated in model • Found a few RCx type measures through post occupancy energy modeling effort • Review of global heating setpoints • Schedule of several AHUs
Knight Center – Benchmark Comparisons EIA - US Energy Information Admin
William H. Neukom Building • Law School office building • Completed in 2011 • 65,000 square feet • VAV Reheat • Operable windows
Neukom Building – Data Analysis • Model underestimates heating loads • Model missed some electric loads • Some outdoor lighting • More emergency lighting than expected (runs 24/7) • Power converter and battery backup for emergency lighting parasitic load
Neukom Building – Benchmark Comparisons EIA - US Energy Information Admin