Chapter 12. Anatomy of a Multimedia Project. Defining a Project. Several steps are required to define a multimedia project. They are: Meeting with the client to determine the project’s budget and deadline Determining the project’s overall purpose and specific objectives

Download Presentation

Anatomy of a Multimedia Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 12 Anatomy of a Multimedia Project

  2. Defining a Project • Several steps are required to define a multimedia project. They are: • Meeting with the client to determine the project’s budget and deadline • Determining the project’s overall purpose and specific objectives • Defining the audience who will use or view the application • Determining how the application will be delivered • Determining the technical and content requirements

  3. Project Design Phase • After the team has analyzed the application’s objectives, audience, and requirements, the project enters the design phase.

  4. What is a project plan? • A project plan generally specifies the project’s scope, its personnel and other resource requirements, its schedule, and its budget.

  5. Defining Project Scope • The team sets priorities and collaborates about: • The application’s content • The application’s size • The hardware and software it will involve

  6. Defining the Project Schedule • With input from the team, the project manager draws up a schedule for developing the application.

  7. Designing the User Interface • The user interface designer creates a navigation map. Navigation schemes can be: • Linear • Hierarchical • Nonlinear • Composite

  8. Developing an Application • Once the project plan is approved, the team begins creating the application. This includes: • Written content • Audio and visual content • Documentation • Production • Testing

  9. Creating Application Content • This includes: • Creating the text for the application • Locating, creating, and editing the audio and visual components of the application • Creating instructions for using the application

  10. Producing the Application • Following the user interface design, text, sounds, and images are incorporated into pages or screen displays

  11. Testing the Application • The application is tested to ensure that the sections work together correctly. • Alpha testing involves testing sections as the producer finishes. • When all sections are complete, the entire application is tested. • A large application may also be beta tested.