Ready: Vacuum line until QTLF.660300 , with pumps and gauges New sector valves, tested Cabling for gauges, sputter ion pumps, valves Vacuum controls. Missing Vacuum line after QTLF.660300 up to window: 44m of piping, connections, gauges, pumps. What is ready/missing?.
E N D
Ready: Vacuum line until QTLF.660300, with pumps and gauges New sector valves, tested Cabling for gauges, sputter ion pumps, valves Vacuum controls Missing Vacuum line after QTLF.660300up to window: 44m of piping, connections, gauges, pumps. What is ready/missing? HiRadMat Vacuum G.Vandoni TE/VSC
Leak detection on the whole line Sputter ion pumps operating Gauges operating Open/close TT66 sector valve Tests during the dry run None. Vacuum tests are a verification of correct installation and therefore close the installation Tests with beam Follow pressure evolution with intensity. Tests before the dry run HiRadMat Vacuum G.Vandoni TE/VSC