VICKSBURG DISTRICT Civil Works Construction Advertising Schedule 1 May 2009 to 30 September 2009
LEGEND: LEGEND: Division HQ location Division HQ location District HQ location District HQ location Division boundary Division boundary District boundary District boundary State boundary State boundary Civil Works Divisions & Districts North Alaska Atlantic Seattle Great Lakes & Ohio River Walla New England Walla Northwestern Portland St. Paul Buffalo Detroit New York Philadelphia Rock Baltmore Chicago Pittsburgh Island Omaha Sacramento - Hunting San ton Cincinnati Francisco Kansas City Norfolk St. South Pacific Louis Louisville Wilmington Nashville Little Tulsa Los Rock Memphis Angeles Southwestern Albuquerque Charleston Atlanta Honolulu Vicksburg - Savannah Ft. Worth Mobile Pacific Jacksonville Dallas Ocean Division South New Orleans Galveston Atlantic Mississippi Valley
Yellowstone Missouri Mississippi Platte Ohio Arkansas Tennessee Canadian Red 41% of U.S. Flows Through the “Body of the Nation” Mississippi River Drainage Basin 4
68,000 square miles 300 miles of Mississippi River 8 ports 12 locks with 9 dams 10 flood control reservoirs 3 hydraulic power generation plants 478 flood control structure 10 flood control reservoirs 21 pumping plants 1,960 miles of levees 1,252 miles of navigable channel 1,709 miles of shoreline 135 recreation areas 3,215 camp sites 2,028 picnic sites Vicksburg District by the Numbers
TargetAccomp. Small Business 32.0 50.9 Small Disadvantaged Business 18.0 8.1 HUBZone Small Business 10.0 36.9 Woman-Owned Small Business 5.8 6.6 Service-Disabled Veteran Owned 3.0 3.5 HBCU/MI 13.4 0.0 FY 09 Small Business Accomplishments(as of April 2009) Program Execution (as of APR 2009)
Channel Improvement Vicksburg District Projects for FY 2009 Advertising Date * Estimated Value Description of Work Project and Item FY 09 Stone Repairs Riprap - Various Locations May 09 $500K - $1.0M Mississippi River Levees Item 468-L Levee Enlargement and Berm Aug 09 Over $10.0M River Museum and Interpretive Center Exhibit Building Over $10.0M Sep 09 * Schedules may change based on availability of funding and other factors.
Mississippi Delta Vicksburg District Projects for FY 2009 Advertising Date * Estimated Value Project and Item Description of Work Headwaters Project RP-05-03, Hickahala Creek Riser Pipe Apr 09 $500K - $1.0M RP-04-04, Yalobusha River Riser Pipe Apr 09 $500K - $1.0M RP-05-02, Yalobusha River Riser Pipe Apr 09 $500K - $1.0M RP-05-03, Hickahala Creek Riser Pipe Apr 09 $500K - $1.0M BS-05-01, Black Creek Bank Stabilization Apr 09 $100K - $500K LD-04-02, Yalobusha River Low Drop Grade Control Structure Apr 09 $500K - $1.0M BS-05-03, Yalobusha River Bank Stabilization Apr 09 $1.0M - $5.0M RP-04-05, Hichahala/Senatobia Creek Riser Pipe May 09 $500K - $1.0M LD-04-05, Hickahala/Senatobia Creek Low Drop Grade Control Structure Jun 09 $500K - $1.0M Riser Pipe RP-04-03, Yalobusha River Jun 09 $500K - $1.0M CI-03-01, Toby Tubby Channel Improvement Jul 09 $5.0M - $10.0M BC-04-01, Hickahala/Senatobia Creek Box Culvert Jul 09 $500K - $1.0M * Schedules may change based on availability of funding and other factors.
Vicksburg District Projects for FY 2009 Advertising Date * Estimated Value Description of Work Project and Item J. Bennett Johnston Waterway Lake St. Agnes Revetment May 09 $1.0M - $5.0M Red River Below Denison Dam Roads on Levee Crown Phase III Gravel Surfacing May 09 $1.0M - $5.0M * Schedules may change based on availability of funding and other factors.
Red River Emergency Vicksburg District Projects for FY 2009 Advertising Date * Project and Item Description of Work Estimated Value Bois D'Arc Revetment Phase III Revetment May 09 $1.0M - $5.0M Ouachita River Levees Monroe to Sandy Bayou Phase III Gravel Surfacing May 09 $500,000 to $1.0M Operation and Maintenance DeGray Lake Oil Containment Jun 09 $100K - $500K Sardis Lake Field Office Building Jun 09 $1.0M - $5.0M * Schedules may change based on availability of funding and other factors.
Search for contracting opportunities with the Vicksburg District at: http://www.mvk.usace.army.mil/offices/contract/ 7261