Project Overview and Initial Semester Plan

The Elks Country Club: Energy and Utility Audit. The Elks Country Club 3224 US 52 West West Lafayette, IN 47906 Contact: Furman Smith. Project Overview and Initial Semester Plan. Team Members. Kohl Ericson Keian Kirkegaard – Project Partner Liaison Chris Klinkhamer – Project Leader

quynh
Download Presentation

Project Overview and Initial Semester Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Elks Country Club: Energy and Utility Audit The Elks Country Club 3224 US 52 West West Lafayette, IN 47906 Contact: Furman Smith Project Overview and Initial Semester Plan

  2. Team Members • Kohl Ericson • KeianKirkegaard – Project Partner Liaison • Chris Klinkhamer – Project Leader • Ivan Peh – Financial Officer • AkankshaSinha

  3. Site Background • Multi-building Recreational Complex • Dining • Banquets and Weddings • Bar/Kitchen • Swimming • Pool and Bathhouse • Tennis • Lighted Courts • Golf • 18 Hole Course • Driving Range

  4. Current Situation • High utility costs • Old furnaces • Oil heating • Systems over 25 years old • No wastewater metering • Swimming pool in use only three months per year • Low tennis court usage with high maintenance costs • Yearly flooding in surrounding lakes • Slow revenue generation

  5. Project Objectives • Improve the Facilities • Reduce Costs • Improve Aesthetics • Draw in New Business • Perform an Energy and Utilities Audit • Electrical • Water/Wastewater • Local Wells • Paid Wastewater Treatment • Heating and Cooling • Natural Gas • Oil

  6. Initial Analysis: Building Specifications For each building being considered: • Construction materials • Room dimensions and/or available building blueprints • Number and type of doors and windows • Sun exposure • Lighting and electrical needs

  7. Initial Analysis: Utility • Utility bills • Water treatment, electricity, oil, gas, etc. • Equipment in Use • Utility consumption • Life and maintenance history • Heating and Cooling (HVAC) • Pumps and boilers • Centralized or not

  8. Initial Analysis: Site Usage • Usage by building • Number of visitors • Peak hour usage • Total amount of space • How space is used • Totalsquare footage • Future plans • Event types and corresponding site requirements

  9. Flowchart

  10. Project Timeline

  11. Questions: