1 / 9

RESULTS

RESULTS. RESULTS PROGETTI. “MARCO POLO”. EU Financing instruments        No Research/no Infrstructures Collateral assisting measures since 1990 State Aids Easier to co-funding specific actions Possible, motorways of the sea/integrating MP Start-up actions. “MARCO POLO II”.

rae-garza
Download Presentation

RESULTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RESULTS

  2. RESULTS PROGETTI

  3. “MARCO POLO” EU Financing instruments        No Research/no Infrstructures Collateral assisting measures since 1990 State Aids Easier to co-funding specific actions Possible, motorways of the sea/integrating MP Start-up actions

  4. “MARCO POLO II” • Background • Objectives • Definition and Focus • Methodology • Budget • Impact

  5. BRENNER In 2004 rail freight traffic maintains but BRC traffic decreased in favor of competition on rail Lokomotion/RTC and TX Logistik operated 465 (378 + 87) trains in October 2004 030129_IF_CONTENTS_DRAFT.PPT

  6. ROAD & RAIL Although during the summertime of 2004 road traffic increased enormous, volume of rail traffic continued

  7. THANK YOU FOR YOUR ATTENTION!

More Related