Engineering Technology Division. Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses. Section 7.2 – Dams, Spillways, Water Conductors and Power Houses. Overview. Dams are Potential Storage Devices
E N D
Engineering Technology Division Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses
Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Overview • Dams are Potential Storage Devices • Design Based on Water Pressure – 33 ft = 14.7 psi • Keys - Head (height) and Water Quantity • Material – Dependent on Type and Head • Spillways – excess water – prevent overtopping • Water Conductors – Piping or Penstock • Power House – Electric Generators
Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Dam Types • Roller Compacted Concrete • Concrete Gravity • Buttress • Rockfill • Earth • Arch
Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Spillways Side Channel Siphon Overflow Tunnel Chutes
Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Water Conductors • Underground • Timber Lining • Steel Pipe • Concrete • Concrete Lining • Bare Rock
Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Power Houses • Contain all the equipment to generate electrical power • Surface Type • Sub Surface Type
Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Power Houses Conventional Integral Intake
Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Pressure