Dominique JAMME Director of Gas Infrastructure and Networks

Welcome to the Workshop on Interconnection Points: Taisnières / Blarégnies / Quévy Oude Statenzijl / Bunde Obergailbach / Medelsheim. Dominique JAMME Director of Gas Infrastructure and Networks Commission de Régulation de l’Energie (CRE).

raiden
Download Presentation

Dominique JAMME Director of Gas Infrastructure and Networks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to the Workshop on Interconnection Points:Taisnières / Blarégnies / QuévyOude Statenzijl / BundeObergailbach / Medelsheim Dominique JAMME Director of Gas Infrastructure and Networks Commission de Régulation de l’Energie (CRE) North-West Gas Regional Initiative – Interconnections and Primary Capacity Markets Work Stream Workshop in Paris (France) – 11 May 2007

  2. Why this Workshop? • The Interconnections & Primary Capacity Markets Workstream of the North-West Regional Initiative is chaired by BNetzA and CRE. • Goals: • to improve transparency on capacity and flows; • to improve gas flows and liquidity at cross-border points located in the region; • to solve interoperability issues; • to support coordination between neighbouring TSOs. • A draft report on generic and specific issues at the cross-border points of the region was presented at the Workshop in Bonn (8-9 February 2007) and published on the ERGEG website. • Main findings: • lack of transparency on capacity and flows, low compliance with Regulation (EC) 1775/2005; • several contractual or physical congestions: • general lack of coordination between TSOs in particular on congestion managment procedures and capacity allocation mechanisms North-West Gas Regional Initiative – Interconnections and Primary Capacity Markets Work Stream Workshop in Paris (France) – 11 May 2007

  3. Why this Workshop? • This workshop aims at deciding on concrete improvements to the identified problems and at deciding on the agenda for: • Taisnières / Blarégnies / Quévy • Oude Statenzijl / Bunde • Obergailbach / Medelsheim North-West Gas Regional Initiative – Interconnections and Primary Capacity Markets Work Stream Workshop in Paris (France) – 11 May 2007

  4. Agenda 11:15 – 12:45 / Kick-off Meeting on Taisnières / Blarégnies / Quévy • Presentation by CREG and CRE (10 minutes) • Proposal(s) from Fluxys and GRTgaz (30 minutes) • Comments and proposals from the Stakeholders and discussion (40 minutes) • Decision on the agenda: next steps and deadlines for implementation (10 minutes) 12:45 – 13:45 / Lunch 13:45 – 15:15 / Kick-off Meeting on Oude Statenzijl / Bunde • Presentation by Dte / Nma and BNetzA (10 minutes) • Proposal(s) from GTS, EGT, Wingas Transport and BEB (30 minutes) • Comments and proposals from the Stakeholders and discussion (40 minutes) • Decision on the agenda: next steps and deadlines for implementation (10 minutes) 15:15 – 15:30 / Break and Coffee 15:30 – 17:00 / Kick-off Meeting on Obergailbach / Medelsheim • Presentation by BNetzA and CRE (10 minutes) • Proposal(s) from EGT, GDFDT and GRTgaz (30 minutes) • Comments and proposals from the Stakeholders and discussion (40 minutes) • Decision on the agenda: next steps and deadlines for implementation (10 minutes) 17:00 – 17:15 / Closing Speech North-West Gas Regional Initiative – Interconnections and Primary Capacity Markets Work Stream Workshop in Paris (France) – 11 May 2007