260 likes | 414 Views
UNDAC MISSION SURINAME. Plan of operations. Main issues. Facilitating Suriname Gvt Strengthening relief chain Consolidate needs assessment Consolidate Sectoral visions Helping affected people. Facilitating Gvt Suriname. NCCR: well structured and functioning
E N D
UNDAC MISSION SURINAME Plan of operations UNDAC MISSION SURINAME
Main issues • Facilitating Suriname Gvt • Strengthening relief chain • Consolidate needs assessment • Consolidate Sectoral visions • Helping affected people UNDAC MISSION SURINAME
Facilitating Gvt Suriname • NCCR: well structured and functioning • Good network for collecting information • Consolidate analysis and reactions • Getting out same messages • Determine needs – acceptance • Prepare logistic chain UNDAC MISSION SURINAME
Relief Chain • Logical, cost effective and structured way to accept and distribute relief goods • Organise national/international relief line • Monitoring • Determine Critical Success Factors • Action when needed to support or strengthen relief line UNDAC MISSION SURINAME
RELIEF LINE • INTERNATIONAL AIRPORT • NATIONAL AIRPORT • MAIN HUBS • HUB’S – VILLAGES • AFFECTED PEOPLE • NCCR: support - control – monitoring - steering UNDAC MISSION SURINAME
INTERNATIONAL AIRPORT • ZAANDERIJ • Determine Consignee • NCCR, adress,... • Responsible Airport Officer • Handling equipment • Warehouse • Customs • Airport aspects (jetfuel,airstrip,...) UNDAC MISSION SURINAME
NATIONAL AIRPORT • ZORG en HOOP • Determine airstrip capacity • Number planes – capacity • Property – Price (long term – multiple flights) • Warehouse • Handling UNDAC MISSION SURINAME
MAIN HUB’sHOOFDSTEUNPUNTEN • STOELMANSEILANDEN • DRIETABIKI • POKIGROM • DJUMU • KWAMALASUMUTU UNDAC MISSION SURINAME
HSP 1 HSP 3 HSP 4 HSP2 UNDAC MISSION SURINAME HSP 5
STOELMANSEILAND (1) Going NORTH – DOWN RIVER • GAKABA • BERGI • LOKA LOKA • TABIKI EDE • NASON • BADATABIKI • SNESIKONDRE • LANGE TABIKI UNDAC MISSION SURINAME
STOELMANSEILAND (2) Going SOUTH UP RIVER • COTTICA • LAWA TABIKI (Benzdorp) • ANAPAIKE UNDAC MISSION SURINAME
DETAIL • Name: Pofiedans • Location: N 4° 37.230 W 054° 24.913 • Inhabitants: 500 total Children 200 • Nr families, • Medische zending • Bediend door: STME UNDAC MISSION SURINAME
DRIETABIKI South: • PUKETI • CLEMENTI North: • GODO OLO • KISAI • CINTHIA / GRANBORI / APETINA / PALUMEU / TEPU UNDAC MISSION SURINAME
POKIGROM • ABENASTON • LADUWANI • GUJABA • PIKINSLEE • BOTOPASI • DAN • KAMBALUWA • SEMOISIE UNDAC MISSION SURINAME
DJUMU • GODO • GRAN DAN • ASINDON MOPO • DANGOGO 1 & 2 • CAJANA UNDAC MISSION SURINAME
KWAMALASAMUTU • APPIKALO • SIPALIWINI UNDAC MISSION SURINAME
5 HOOFDSTEUNPUNTEN • SECURITY - OPs : MOD • AIRSTRIP – HELI fuel: Air Tp Coord • RADIO existing comm Zending • SAT/MAIL TSF • WAREHOUSE: dry • LEAD AGENCY/NGO • FIGURES: village’s – families – info facilities UNDAC MISSION SURINAME
CONSOLIDATE NEEDSASSESSMENTS • PER SECTOR • PER REGION • PER HOOFDSTEUNPUNT • PRIORITISATION BY GVT UNDAC MISSION SURINAME
SHELTERING • Tents • Sheeting • Tarpaulin • Determine what where why! • Nails • SECTORMEETING! URGENT UNDAC MISSION SURINAME
FOOD • Parcels: biscuits • MRE: no can! • Family packets: • Per 5 person • For 5 day’s • Bulk: Warehouse? Handling? Transport? • WFP UNDAC MISSION SURINAME
DRINKING WATER • PURIFICATION TABLETS • PURIFICATION UNITS • WATER TANKS / BLADDERS 10m³ - 10.000 Li • HAND WATER PUMPS UNDAC MISSION SURINAME
FUEL • TYPE Jet/ Diesel/ Normal/ 4takt • TANKS • FUEL HAND PUMPS 2” • 6000 m HOSE UNDAC MISSION SURINAME
HEALTH • MOSQUITO NETS DOUBLE BED IMPREGNATED 25.000 • MALARIA PROHYLAXIS 5000 • YELLOW FEVER DOSES 5000 • THYPHOID FEVER (Typhim – 4000) • COLD CHAIN!! UNDAC MISSION SURINAME
Who’s responable for what • Each sector responsible of the SURINAME Gvt; • Each sector responsible Agency/NGO • Each sector regular meetings UNDAC MISSION SURINAME
SECTOR’S • HEALTH: MoH – PAHO • SHELTER: • FOOD: • WATER/SANITATION: • LOGISTICS: • Tpt • Education UNDAC MISSION SURINAME